06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GABIONS <strong>and</strong> Reno mattress have been used to stabilize stream banks for many years. Results have<br />

been mixed. While successful in many locations, gabions have failed where undermined or where the<br />

wire baskets have been damaged by abrasion or corrosion. Therefore, before specifying gabions for<br />

streambank stabilization, consideration should be given to the available substrate, pH, <strong>and</strong> anticipated<br />

sediment transport of the water. If these are not suitable, another form of stabilization should be<br />

considered.<br />

York County Conservation District<br />

Where gabions or Reno mattresses are proposed, they are typically installed as shown in Figure 15.3<br />

or 15.4. As with other types of stabilization, sufficient details should be provided on the detail sheets to<br />

ensure their proper installation, <strong>and</strong> supporting calculations should be included in the narrative to show<br />

they are properly sized. Gabion <strong>and</strong> Reno mattress installations should be designed according to<br />

manufacturers’ specifications.<br />

Special attention should be given to preventing scour at the upstream <strong>and</strong> downstream ends of the<br />

baskets. Appropriate means to prevent undermining should also be taken.<br />

363-2134-008 / March 31, 2012 / Page 307

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!