stabilization; cutting of existing cut slopes; inlet <strong>and</strong> endwall cleaning; reshaping <strong>and</strong> cleaning<br />

drainage ditches <strong>and</strong> swales; pipe cleaning; pipe replacement; support activities incidental to<br />

resurfacing activities such as minor vertical adjustment to meet grade of resurfaced area; ballast<br />

cleaning; laying additional ballast; replacing ballast, ties <strong>and</strong> rails; <strong>and</strong> other similar activities.<br />

The existing road cross-section consists of the original graded area between the existing toes of<br />

fill slopes <strong>and</strong> tops of cut slopes on either side of the road <strong>and</strong> any associated drainage<br />

features.<br />

Roadbed -----That portion of a roadway extending from curb line to curb line or from shoulder line to<br />

shoulder line. Divided highways are considered to have two roadbeds.<br />

Rock Chimney Drain -----A comparatively small vertical extension of a rock toe bench maintained<br />

within a constructed earthen fill to facilitate drainage of surface runoff from the top of the fill into<br />

the rock toe bench. The purpose of this drainage is to prevent concentrated flows <strong>and</strong> the<br />

formation of erosion gullies on the outslope(s) of the fill <strong>and</strong> to remove some of the sediment<br />

load prior to discharge to receiving surface waters.<br />

Rock Construction Entrance -----A method of stabilizing a temporary construction entrance to a<br />

project site from a paved roadway by placement of AASHTO #1 stone. See St<strong>and</strong>ard<br />

Construction Detail #3-1.<br />

Rock Filter -----A sediment barrier constructed from riprap <strong>and</strong> filter stone. See St<strong>and</strong>ard Construction<br />

Detail # 4-14.<br />

Rock Filter Berm -----A sediment barrier constructed across a right-of-way or below a disturbed area.<br />

Due to the cost of construction, this BMP should be used only where no other BMP is feasible.<br />

Rock Filter Outlet -----A sediment barrier constructed at points where concentrated flow is anticipated<br />

at a silt fence or straw bale barrier or where concentrated flow has caused the failure of a<br />

barrier.<br />

Rock Toe Bench -----An excavated <strong>and</strong> rock-filled structure constructed at the base of a fill where the<br />

foundation is located in water or in saturated or unstable soils to ensure proper drainage <strong>and</strong><br />

support for the overlying earthen fill.<br />

Rock Vanes -----Rock structures used in FGM-based restoration projects; slope <strong>and</strong> shape of the rock<br />

vane reduces the velocity of the water as it flows up the vane <strong>and</strong> accelerates the flow as it rolls<br />

water away from the bank towards the center of the stream; the net effect is to protect the bank<br />

from erosion <strong>and</strong> to direct the force of the water into the center of the stream for sediment<br />

transport.<br />

ROD -----Record of decision.<br />

Rodent Gate -----An appurtenance at the outlet end of a drainage pipe that swings outwards to permit<br />

flow <strong>and</strong> detritus to pass, yet prevents rodents <strong>and</strong> other animals from entering <strong>and</strong> potentially<br />

blocking the system.<br />

Rolled <strong>Erosion</strong> <strong>Control</strong> Products (RECPs) -----Temporary, degradable or long-term, non-degradable<br />

material manufactured or fabricated into rolls <strong>and</strong> designed to be rolled out <strong>and</strong> staked onto an<br />

exposed surface to reduce soil erosion <strong>and</strong> promote the growth of protective vegetation.<br />

Root Zone -----That part of a soil which can be penetrated by plant roots.<br />

Rooted -----Expression indicating that a bank has been excavated <strong>and</strong> the end of a structure, such as a<br />

check dam, dike, etc., has been placed in the cavity, thus retarding future streamflow around the<br />

end of the structure — flanking.<br />

Rootwad -----A tree stump with roots that are strategically placed in a stream bank as part of rebuilding<br />

or restoring the bank; it is typically used to control erosion on outside bends; rootwads are<br />

angled upstream with the root mass facing the flow; this serves to dissipate energy by receiving<br />

the brunt of the stream energy.<br />

Roughness -----The resistance of streambed materials, vegetation, or liners to the flow of water in a<br />

channel or swale.<br />

Roughness Coefficient -----A dimensionless value in Manning’s Equation that varies depending upon<br />

the type of lining <strong>and</strong> flow depth.<br />

Routing -----The process of transposing an inflow hydrograph through a structure <strong>and</strong> determining the<br />

outflow hydrograph from the structure.<br />

Rubble -----Rough, irregular fragments of broken rock or concrete.<br />

Runoff -----That portion of a rainfall or snowmelt that flows over the surface.<br />

363-2134-008 / March 31, 2012 / Page 543