06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

USDA Forest Service<br />

STANDARD CONSTRUCTION DETAIL #3-8<br />

Open-top Culvert<br />

Culverts shall be inspected weekly <strong>and</strong> after runoff events.<br />

Damaged or non-functioning culverts shall be repaired by the end of the workday.<br />

Accumulated sediment shall be removed within 24 hours of inspection.<br />

Maximum spacing of open-top culverts shall be as shown in Table 3.2.<br />

363-2134-008 / March 31, 2012 / Page 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!