06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No<br />

RECOMMENDED PROCESS FOR SITES WITH REGULATED SUBSTANCES<br />

Note: It is the responsibility of the applicant, not the NPDES Permitting program, to ensure that proper procedures are followed.<br />

START HERE<br />

Complete NPDES Permit<br />

Application Received<br />

Check each regulated substance listed<br />

in Application<br />

FOR EACH REGULATED SUBSTANCE<br />

(pollutant) LISTED, does substance<br />

exceed the Soil to Groundwater Pathway<br />

thresholds? Follow Note A<br />

Blend<br />

substance<br />

with<br />

surrounding<br />

soils<br />

Blending is used for<br />

orchards <strong>and</strong><br />

agricultural sites<br />

(pesticide related).<br />

Sequence of<br />

construction, plan, <strong>and</strong><br />

details must address<br />

blending of contaminant<br />

AND follow Note D<br />

Cover substance<br />

with fill or<br />

pavement,<br />

or do nothing.<br />

Follow Notes D<br />

<strong>and</strong> H; No<br />

Does substance exceed<br />

the Direct Contact<br />

(human exposure -<br />

ingestion/ inhalation)<br />

thresholds?<br />

Follow Notes B <strong>and</strong> H<br />

Yes<br />

Follow Note F<br />

Infiltration is acceptable<br />

based on this known<br />

concentration of this<br />

substance<br />

What type of remediation<br />

is being proposed?<br />

Yes<br />

No<br />

Yes or<br />

N/A<br />

Follow Note G<br />

FLOW CHART A<br />

Encapsulate<br />

substance<br />

following<br />

appropriate<br />

federal, state <strong>and</strong><br />

local requirements<br />

Completely haul<br />

substance off-site<br />

Completely move a<br />

regulated substance<br />

from a cut excavation<br />

area to an on-site<br />

proposed designated<br />

area (in a fill excavation<br />

area); This allows<br />

future disclosures of<br />

the site to have<br />

continuity; Follow Note<br />

G; Sequence of<br />

construction <strong>and</strong> E&S<br />

plan must address the<br />

remediation plan; AND<br />

follow Note D<br />

Do horizontal<br />

<strong>and</strong> vertical limits<br />

of capping*<br />

completely<br />

enclose<br />

substance?<br />

If infiltration is proposed, has<br />

contaminant passed Synthetic<br />

Precipitation Leaching Procedures<br />

(SPLP) test per Title 25 Chapter<br />

250 Section 308? See Note C<br />

Z<br />

Does substance<br />

exceed the<br />

Direct Contact<br />

(human exposure -<br />

ingestion/inhalation)<br />

thresholds?<br />

Follow Note B<br />

Yes<br />

Substance is not a concern per<br />

applicant's due diligence; AND<br />

follow Notes D <strong>and</strong> H;<br />

Is proposed<br />

redevelopment<br />

Residential?<br />

(check definition<br />

in Chapter 250)<br />

Follow Notes<br />

F <strong>and</strong> H<br />

363-2134-008 / March 31, 2012 / Page 335<br />

Yes<br />

No<br />

No<br />

No<br />

Z<br />

Yes<br />

Follow Note G;<br />

Also, follow Note E;<br />

Sequence of construction <strong>and</strong><br />

details must address<br />

excavation, hauling of<br />

contaminant, <strong>and</strong> trenching<br />

around staging stockpile to<br />

sump to be pumped <strong>and</strong><br />

hauled; also excavator bucket<br />

wash area should be protected<br />

Follow Note G;<br />

Ensure proposed<br />

redevelopment foundations<br />

<strong>and</strong> utilities do not impact<br />

the limits of the capping*.<br />

Sequence of construction <strong>and</strong><br />

details must address capping<br />

of contaminant<br />

*Capping – impermeable soils or<br />

synthetic membrane liner.<br />

Infiltration is discouraged in<br />

areas of regulated substance<br />

including a reasonable buffer<br />

area around the known<br />

location. Seek other<br />

alternatives. Refer to Ch.<br />

250.308 subsection (b) or (d)<br />

OR completely haul<br />

contaminant off-site OR nonuse<br />

aquifer determination is<br />

granted. (check with ECP)<br />

Requires at least 2 feet of fill<br />

(or pavement) between<br />

proposed grade <strong>and</strong><br />

contaminant. Also, direct<br />

contact with contaminated soil<br />

should also be avoided during<br />

construction. Sequence of<br />

construction <strong>and</strong> plans must<br />

address placement of fill or<br />

pavement, <strong>and</strong> health <strong>and</strong><br />

safety of construction workers;<br />

AND follow Notes D <strong>and</strong> H;<br />

Requires at least 15 feet of fill<br />

between proposed grade <strong>and</strong><br />

contaminant. Also, direct<br />

contact with contaminated soil<br />

should also be avoided during<br />

construction. Sequence of<br />

construction <strong>and</strong> plans must<br />

address placement of fill or<br />

pavement, <strong>and</strong> health <strong>and</strong><br />

safety of construction workers;<br />

AND follow Note D <strong>and</strong> H;<br />

Z<br />

Z<br />

Z

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!