06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

East Coast <strong>Erosion</strong> Blankets, LLC<br />

STANDARD CONSTRUCTION DETAIL # 7-13<br />

<strong>Sediment</strong> Basin Emergency Spillway with TRM Lining<br />

NOTE: This table is intentionally blank <strong>and</strong> should be filled in by the plan preparer.<br />

BASIN<br />

NO.<br />

Z3<br />

(FT)<br />

Z4<br />

(FT)<br />

WEIR LINING CHANNEL DISSIPATER<br />

TOP<br />

ELEV<br />

WTE<br />

(FT)<br />

CREST<br />

ELEV<br />

WCE<br />

(FT)<br />

WIDTH<br />

W w<br />

(FT)<br />

TRM<br />

Type<br />

STAPLE<br />

PATTERN<br />

Z5<br />

(FT)<br />

DEPTH<br />

C d<br />

(FT)<br />

LENGTH<br />

DI<br />

(FT)<br />

363-2134-008 / March 31, 2012 / Page 194<br />

WIDTH<br />

D w<br />

(FT)<br />

RIPRAP<br />

SIZE<br />

(R-___)<br />

RIPRAP<br />

THICK.<br />

DRt<br />

(IN)<br />

Heavy equipment shall not cross over spillway without precautions taken to protect TRM lining.<br />

Displaced liner within the spillway <strong>and</strong>/or outlet channel shall be replaced immediately.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!