06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STANDARD CONSTRUCTION DETAIL # 4-4<br />

Weighted <strong>Sediment</strong> Filter Tube Installation in a Concentrated Flow Area<br />

Adapted from ACF<br />

PLAN VIEW<br />

NOTE: This detail applicable to flow paths with widths < one tube length.<br />

Metal T-posts shall be installed at the center <strong>and</strong> at each end of the tube. Additional T-posts<br />

shall be installed as needed to meet the maximum 2-foot spacing.<br />

<strong>Sediment</strong> tubes shall be inspected weekly <strong>and</strong> after each runoff event.<br />

Accumulated sediment shall be removed when it reaches half the height of the tube <strong>and</strong><br />

disposed as directed elsewhere in the E&S plan.<br />

Damaged tubes shall be repaired or replaced within 24 hours of inspection. A supply of tubes<br />

shall be kept on site for this purpose.<br />

363-2134-008 / March 31, 2012 / Page 71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!