06.05.2013 Views

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

Erosion and Sediment Pollution Control Program Manual.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STANDARD E&S CONTROL PLAN TECHNICAL REVIEW CHECKLIST<br />

Project: NPDES/Project No.<br />

Project Location: Date:<br />

Check-off: c = Complies, d = Deficient, na = Not applicable<br />

Item Location: D = E&S Drawings, N = E&S Narrative, D&N = Drawings <strong>and</strong> Narrative<br />

“The E&S Plan shall be prepared by a person trained <strong>and</strong> experienced in E&S control methods<br />

<strong>and</strong> techniques applicable to the size <strong>and</strong> scope of the project being designed”<br />

Name Address Telephone No. D&N<br />

“The existing topographic features of the project site <strong>and</strong> the immediate surrounding area”<br />

Legible mapping D<br />

Existing contours D<br />

____________ Type of cover D<br />

Existing improvements, i.e. roads, buildings, utilities, etc. D<br />

Sufficient surrounding area D<br />

Complete mapping symbols legend <strong>and</strong> north arrow D<br />

Location map, i.e. USGS D or N<br />

“The types, depth, slope, locations <strong>and</strong> limitations of the soils”<br />

Types, slopes, <strong>and</strong> locations of soil types D<br />

Soil type use limitations <strong>and</strong> resolutions N<br />

Hydric soils N<br />

“The characteristics of the earth disturbance activity, including the past, present, <strong>and</strong> proposed<br />

l<strong>and</strong> uses <strong>and</strong> the proposed alteration to the project site”<br />

Proposed NPDES boundary <strong>and</strong> limits of construction D<br />

Proposed contours/grades D<br />

Proposed waterways <strong>and</strong> stormwater management facilities D<br />

Proposed improvements, i.e., roads, buildings, utilities, etc. D<br />

Past, present <strong>and</strong> proposed l<strong>and</strong> uses N<br />

“The volume <strong>and</strong> rate of runoff from the project area <strong>and</strong> its upstream watershed area”<br />

Maximum during construction drainage areas D<br />

Offsite drainage area(s) on USGS quadrangle map N<br />

____________ Discharge analysis provided for non-surface water discharges N<br />

“The location of all surface waters of this Commonwealth that may receive runoff within or from<br />

the project site <strong>and</strong> their classification under Chapter 93”<br />

Existing streams, wetl<strong>and</strong>s, floodway, etc. D<br />

Receiving watercourses D<br />

Chapter 93 classification of streams or other waterbodies N<br />

363-2134-008 / March 31, 2012 / Page 357

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!