WETLAND CROSSING<br />

Wetl<strong>and</strong> crossings must be avoided wherever possible. Where that is not possible, the location of the<br />

crossing <strong>and</strong> its orientation must be selected so as to have the least possible impact upon the wetl<strong>and</strong>.<br />

All wetl<strong>and</strong> crossings must conform to Chapter 105 permitting requirements.<br />

Temporary crossings should be constructed from materials that can be placed with a minimum of<br />

disturbance to the soil surface <strong>and</strong> completely removed when no longer needed. Some examples of<br />

stabilized crossing methods are illustrated in Figures 3.5 through 3.7 below.<br />

FIGURE 3.5<br />

Typical Tire Mat Wetl<strong>and</strong> Crossing<br />

University of Minnesota FS 07013<br />

FIGURE 3.6<br />

Typical Exp<strong>and</strong>ed Metal Grating Wetl<strong>and</strong> Crossing<br />

University of Minnesota FS 07011<br />