Adapted from PennDOT RC-70<br />

STANDARD CONSTRUCTION DETAIL # 7-15<br />

Metal Anti-seep Collar for Temporary Basins or Traps<br />

Collar shall be of same gage <strong>and</strong> with same coating as pipe with which it is used.<br />

Install with corrugations vertical.<br />

Minimum distance to pipe joint shall be 2 feet.<br />

All collars shall be installed so as to be watertight. The lap between the two half sections <strong>and</strong><br />

between the pipe <strong>and</strong> connecting b<strong>and</strong> shall be caulked with asphalt mastic at time of<br />

installation.<br />

Collar size <strong>and</strong> spacing shall be as indicated below.<br />

NOTE: This table is intentionally blank <strong>and</strong> should be filled in by the plan preparer.<br />

Basin or Trap<br />

No.<br />

Pipe Size<br />

(in)<br />

S (in)<br />

No. of Collars<br />

363-2134-008 / March 31, 2012 / Page 207<br />

Distance Riser<br />

to 1 st Collar<br />

(ft)<br />

Collar Spacing<br />

(ft)