13.2.7.3 Power Measurement<br />

The basic specifications for power measurement are entered in this dialog. Further<br />

specifications can be made depending on the type of power measurement selected. The<br />

following power measurement categories are available:<br />

Type of Power Measurement<br />

• No Power Measurement<br />

• 96 Hour Measurement<br />

• Standard Calculation (¼ hour power measurement)<br />

• Light/Heavy Load Maximums<br />

No Power Measurement<br />

If the tariff for energy supply from the grid suffices without power measurement, then you<br />

should select ”No Power Measurement”.<br />

96 Hour Measurement<br />

With the 96 hour tariff the electricity consumption in kWh within 96 consecutive hours is<br />

added together in a consecutive time window. These hourly values are called power<br />

values (Pow. Val.). The highest power value within the time period measured is used for<br />

the calculation of power payment. The power payment is the sum of the highest power<br />

value multiplied by the valid load price for annual electricity consumption according to<br />

the given pricing band.<br />

During 96 hour measurement with time zone regulation, the recording of the power<br />

values during low tariff is suspended without changing the consecutive timing for the 96<br />

hour measurement periods. In this case Measurement Only During HT Periods must be<br />

selected in the Load Price dialog<br />

Standard Calculation (¼ hour power measurement)<br />

This calculates the power from the average value of the highest monthly power output<br />

figures. The number of months that are used to calculate the maximum annual power<br />

output is entered in the Load Price dialog.<br />

Light/Heavy Load Maximums<br />

¼ hour power measurement, with the time period used for providing the billing load<br />

being limited to the so called heavy load periods. These heavy load periods are entered<br />

in the Heavy Load Periods dialog. Further definition of the heavy load peak is described<br />

under Standard Calculation.<br />

The lowest monthly light load is entered separately.<br />