BOSNIA & HERZEGOVINA - – National study<br />

Figure 1 The mines and thermo-power plants in B&H<br />

Today, in B&H there are three separated vertically organized companies that are in charge<br />

for production, transmission and distribution of electricity.<br />

Elektroprivreda B&H with head office in Sarajevo (EPB&H)<br />

Elektroprivreda of Croatian Community of Herceg Bosna with head office in<br />

Mostar (EPCCHB)<br />

Elektroprivreda of Republic of Srpska with head office in Trebinje (EPRS)<br />

Besides, there are also newly established state level Transmission Company Transco in<br />

Banja Luka, then newly established Independent System Operator (ISO) and also State<br />

Regulatory Power Commission (SRPC) in Tuzla. The production capacities per companies in<br />

B&H are the following: [4]<br />

Table 19 The electricity production capacities per companies in B&H<br />

EPB&H EPCCHB EPRS TOTAL<br />

Total capacity in 1,849 or 47%of 762 or 19% of B&H 1,346 or 34% of<br />

3,957<br />

MW<br />

B&H total<br />

total<br />

B&H total<br />

HPP (without small<br />

HPP)<br />

492 or 26% 762 or 100% 746 or 55% 2,000 or 51%<br />

TPP 1,357 or 74% 0 or 0% 600 or 45% 1,957 or 49%<br />

Source: <strong>Plan</strong> for construction of new power production capacities in FB&H<br />

Length of electricity network: The B&H high-voltage system consists of 992 km of 400 kV<br />

transmission line, 1,691 km of 220 kV transmission line, and 3,680 km of 110 kV<br />

transmission line. Total transforming capacity in 134 high-voltage substations is 12,013 MVA.<br />

[7].<br />

System of gas supply: The main features of the gas system in BiH are: length of 191 km<br />

and the projected annual capacities of 1 billion m 3 . The existing leased transport capacities to<br />

BiH are 750 million m 3 /year, and the takeover pressure of incoming natural gas from<br />

receiving-distribution gas station in Zvornik is 26 bars.<br />