BOSNIA & HERZEGOVINA - – National study<br />

Parameter<br />

Surface pit<br />

Gračanica %<br />

K2O 0.95<br />

The ecological problem is evident, taking into consideration that water excess has been<br />

discharged into the recipient of Gračanice and Mušnica Rivers, and further into the<br />

catchment area of reservoir Bileća of Trebišnjica River. The reservoir Bileća is the largest<br />

artificial reservoir on the Balkan, and the Trebišnjica River is the largest sinking river in<br />

Europe and that basin is the basic reservoir of drinking water in the region. Currently the ash<br />

disposal has been carried out in improvised way, which has not been approved by the B&H<br />

institutions and it is necessary to carry out the implementation of the ash disposal project in<br />

the form of dense hydro-mixture that satisfy all legal and technological requirements and by<br />

which the requested ecological standards are fully satisfied. It has been assumed that ash<br />

transfer by wind leads to endangerment of the area that is 15 times larger then the disposal<br />

site.<br />

Indicator Source<br />

Ozone picks<br />

frequency<br />

3.17<br />

Table 42 Indicator ENE_C13 Ozone picks frequency<br />

www.eionet.europa.eu There is no data showing ozone picks frequency<br />

2.4 Financ ing and inve s t ment needs<br />

There is no national strategy for investments available in this moment. It will be done after<br />

the national strategy for energy is adopted.<br />

There are available some studies done by Elektroprivreda B&H. It says in the study:<br />

In different studies (foreign and domestic) for restoration of production capacities (technical<br />

restoration + environment protection), the different scope of activities has been foreseen, in<br />

the sense of amounts and dynamics of investing the necessary resources. The illustration is<br />

given on the picture below where the necessary resources and dynamics of investments for<br />

restoration of existing TPP of PC<br />

Elektroprivreda B&H (TPP Tuzla and TPP Kakanj) are given according to one of the<br />

researches (Fichtner Study).<br />

Figure 3 The necessary funds for restoration of existing TPP of PC Elektroprivreda B&H (according to<br />

Fichtner Study)<br />

The power plants, candidates for construction in PC Elektroprivreda B&H up to 2010 for<br />

satisfying the higher scenario of development are shown in Table 43.<br />

123