220<br />

ENERGY AND SUSTAINABLE DEVELOPMENT IN THE MEDITERRANEAN<br />

The summarized result of the study is as follows:<br />

Table 4.4. Wind data and energy production assuming a turbine of the type VENSYS 77<br />

(including 20% reduction because of wake effects and safety reduction)<br />

Type Value<br />

wind speed at 10m (measured at Larnaca Airport) 4.15 m/s<br />

wind speed at 85m (calculated) 6.7 m/s<br />

energy production wind farm (21 x VENSYS 77) 69,380 MWh/a<br />

Whilst the measured wind speeds at Larnaca Airport were not very high (4.15 m/s at a height<br />

of 10m), the extrapolation to hub height and the analysis of the anticipated production shows<br />

reasonable results due to the anticipated high efficiency of the chosen wind turbine type.<br />

The expected energy production of 69,380 MWh/a includes a 20% safety reduction, as onsite<br />

wind measurements have not been carried out yet.<br />

4.3.4 Reduction of GHG emissions<br />

The implementation of Alexigros Wind Farm Project will generate an estimated reduction of<br />

388,910 tCO2 over the first crediting period of 7 years. This reduction results from the<br />

displacement of the generation of electrical energy from the fossil fuel fired plants that would<br />

otherwise have fed electricity into the national grid. The proposed project faces several<br />

barriers, especially technological barriers, barriers due to prevailing practice and investment<br />

barriers.