Breakthrough Technologies Institute - Fuel Cells 2000
Breakthrough Technologies Institute - Fuel Cells 2000
Breakthrough Technologies Institute - Fuel Cells 2000
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Contact:<br />
• Purchase and install commercial fuel cells at state facilities;<br />
• Support early adoption of fuel cell technology through tax incentives; and<br />
• Encourage the creation of standards for the fuel cell industry.<br />
Ohio Department of Development<br />
Technology Division<br />
77 South High Street, 25th Floor<br />
Columbus, OH 43215-6130<br />
Phone: (614) 466-3887<br />
E-mail: info@odod.state.oh.us<br />
Web: www.odod.state.oh.us<br />
<strong>Fuel</strong> Cell Supply Chain Database<br />
www.emtec.org/fuelcells/fcsc/index.php<br />
Edison Materials Technology Center <strong>Fuel</strong> Cell Group has developed a database<br />
describing the supply chain for fuel cells and the associated hydrogen infrastructure in<br />
Ohio. The intent is to establish an on-line forum where fuel cell developers, system<br />
integrators and prospective component manufacturers can assess their potential roles in<br />
the fuel cell supply chain, present their respective credentials, and be linked to possible<br />
consumers of their goods and services. The database was developed with funding<br />
support from an Ohio Department of Development grant and in affiliation with the Ohio<br />
<strong>Fuel</strong> Cell Coalition.<br />
Contact:<br />
Edison Materials Technology Center<br />
<strong>Fuel</strong> Cell Group<br />
3155 Research Blvd.<br />
Dayton, Ohio 45420<br />
Phone: (937) 259-1365<br />
Fax: (937) 259-1303<br />
E-mail: www.emtec.org/fuelcells/contactus.php<br />
2. STANDARDS/REGULATIONS<br />
POWER GENERATION<br />
Interconnection Standards<br />
www.puco.ohio.gov/PUCO/Consumer/information.cfm?doc_id=115<br />
www.puco.ohio.gov/emplibrary/files/legal/05-1500/05-1500-Entry.doc<br />
A 1999 Ohio electric utility restructuring act established net metering for renewableenergy<br />
systems, including fuel cells. The Ohio Public Utilities Commission (PUC)<br />
subsequently issued interconnection standards for distributed generation in 2001.<br />
163