per year between 2008 and 2020. By 2020, Tier 1 resources will comprise<br />
8% of energy sales.<br />
• Tier II resources, which will start at 4.2% of retail energy sales by no later<br />
than the end of February 2007, will increase by 2% in 2010 (6.2%) , by 2% in<br />
2015 (8.2%), and will finally comprise 10% of energy sales in 2020.<br />
• Solar photovoltaic, which will start at .00113% of retail energy sales by no<br />
later than the end of February 2007, will increase by .0019% in 2010<br />
(0.0203%) , by .2297% in 2015 (0.2500%), and will finally comprise 0.5000%<br />
of energy sales in 2020.<br />
Pennsylvania Public Utilities Commission<br />
P.O. Box 3265<br />
Harrisburg , PA 17105-3265<br />
Phone: (717) 783-1740<br />
E-mail: www.puc.state.pa.us/general/feedback.aspx<br />
Web: www.puc.state.pa.us<br />
Interconnection Standards<br />
www.puc.state.pa.us/electric/electric_aeps_working_groups.aspx<br />
The Alternative Energy Portfolio Standards Act requires the Commission to promulgate<br />
net metering and interconnection rules for customer-generators intending to operate<br />
renewable onsite generators in parallel with the electric utility grid.<br />
The Public Utilities Commission has issued separate proposed rulemaking orders on net<br />
metering and interconnection in November 2005. The interconnection procedures apply<br />
to customer-generators with small generator facilities that satisfy the following criteria:<br />
• The electric nameplate capacity of the small generator facility is equal to or<br />
less than 2 MW;<br />
• The small generator facility is not subject to the interconnection requirements<br />
of a regional transmission organization; and<br />
• The small generator facility is designed to operate in parallel with the electric<br />
distribution system.<br />
The procedures divide the process into four distinct review screens, Levels 1, 2, 3, and<br />
4, depending on the size and nature of the interconnection equipment involved.<br />
Contact:<br />
Pennsylvania Public Utilities Commission<br />
P.O. Box 3265<br />
Harrisburg , PA 17105-3265<br />
Phone: (717) 783-1740<br />
E-mail: www.puc.state.pa.us/general/feedback.aspx<br />
Web: www.puc.state.pa.us<br />
Net Metering<br />
177