Contact:<br />

per year between 2008 and 2020. By 2020, Tier 1 resources will comprise<br />

8% of energy sales.<br />

• Tier II resources, which will start at 4.2% of retail energy sales by no later<br />

than the end of February 2007, will increase by 2% in 2010 (6.2%) , by 2% in<br />

2015 (8.2%), and will finally comprise 10% of energy sales in 2020.<br />

• Solar photovoltaic, which will start at .00113% of retail energy sales by no<br />

later than the end of February 2007, will increase by .0019% in 2010<br />

(0.0203%) , by .2297% in 2015 (0.2500%), and will finally comprise 0.5000%<br />

of energy sales in 2020.<br />

Pennsylvania Public Utilities Commission<br />

P.O. Box 3265<br />

Harrisburg , PA 17105-3265<br />

Phone: (717) 783-1740<br />

E-mail: www.puc.state.pa.us/general/feedback.aspx<br />

Web: www.puc.state.pa.us<br />

Interconnection Standards<br />

www.puc.state.pa.us/electric/electric_aeps_working_groups.aspx<br />

The Alternative Energy Portfolio Standards Act requires the Commission to promulgate<br />

net metering and interconnection rules for customer-generators intending to operate<br />

renewable onsite generators in parallel with the electric utility grid.<br />

The Public Utilities Commission has issued separate proposed rulemaking orders on net<br />

metering and interconnection in November 2005. The interconnection procedures apply<br />

to customer-generators with small generator facilities that satisfy the following criteria:<br />

• The electric nameplate capacity of the small generator facility is equal to or<br />

less than 2 MW;<br />

• The small generator facility is not subject to the interconnection requirements<br />

of a regional transmission organization; and<br />

• The small generator facility is designed to operate in parallel with the electric<br />

distribution system.<br />

The procedures divide the process into four distinct review screens, Levels 1, 2, 3, and<br />

4, depending on the size and nature of the interconnection equipment involved.<br />

Contact:<br />

Pennsylvania Public Utilities Commission<br />

P.O. Box 3265<br />

Harrisburg , PA 17105-3265<br />

Phone: (717) 783-1740<br />

E-mail: www.puc.state.pa.us/general/feedback.aspx<br />

Web: www.puc.state.pa.us<br />

Net Metering<br />

177