Creation of a 4th assembly line for steam<br />
generators at Pont Evêque, France<br />
31<br />
FUNDAMENTALS<br />
A close partnership with major suppliers<br />
For some very commonplace products or for those with a high<br />
added value, <strong>Groupe</strong> SEB has chosen to use <strong>the</strong> services of carefully selected<br />
sub-contractors. In 2012, sourcing represented 27% of <strong>the</strong> products sold.<br />
With its 15 main suppliers, who account for approximately 65% of our<br />
purchases of finished products, <strong>the</strong> Group has developed methods<br />
comparable with those used internally to guarantee a high level of quality<br />
for products, processes, schedules and logistics. The presence of an industrial<br />
team based in Hong Kong, <strong>Seb</strong> Asia, which manages purchases from<br />
Asian suppliers and logistics, as well as specific product projects, is also a<br />
major asset in terms of managing <strong>the</strong> purchase of finished products in Asia.<br />
S u s t a i n a b l e D e v e l o p m e n t<br />
74% of <strong>the</strong> production<br />
at <strong>the</strong> Rumilly factory<br />
are exported<br />
In France,<br />
<strong>the</strong> Quality Improvement Plan has<br />
enabled us to reduce <strong>the</strong> return<br />
rate for products by a third<br />
iS-Sur-tille cutS itS energy<br />
conSumption<br />
"The best energy is that which hasn’t been used or has been<br />
recovered." With this maxim in mind, <strong>the</strong> French team<br />
at Is-sur-Tille (Burgundy) has been working on a heat<br />
recovery project. This initiative involves <strong>the</strong> safe transfer<br />
of calories emitted by <strong>the</strong> industrial activity at <strong>the</strong> site,<br />
in particular through repetitive tests on ovens and o<strong>the</strong>r<br />
test products, to an adjacent building fitted with 5 electrical<br />
heaters. Since <strong>the</strong>n, none of <strong>the</strong>se heaters has been<br />
needed and <strong>the</strong> electricity consumption for heating <strong>the</strong><br />
building has been divided by 22! This principle is currently<br />
being rolled out to o<strong>the</strong>r parts of <strong>the</strong> factory.