21.01.2014 Views

Structural Health Monitoring Using Smart Sensors - ideals ...

Structural Health Monitoring Using Smart Sensors - ideals ...

Structural Health Monitoring Using Smart Sensors - ideals ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 7.7. Instructions in DCS Code<br />

Instruction Associated Operations Accompanying Information<br />

1<br />

10<br />

2a<br />

2b<br />

The cluster heads save node IDs and<br />

measurement channels of their leaf nodes.<br />

The base station tells the PC that the base<br />

station is ready to receive the next<br />

instruction.<br />

Cluster heads save measurement directions<br />

of member nodes and forward this<br />

information to the leaf nodes.<br />

The leaf nodes save measurement<br />

directions.<br />

4 The cluster heads save NExT parameters.<br />

3c<br />

22-25<br />

26<br />

32<br />

33<br />

34<br />

39<br />

3a<br />

3b<br />

50<br />

51<br />

52<br />

Sensing parameters are saved on cluster<br />

heads.<br />

Received parameters are saved on cluster<br />

heads.<br />

The manager receives node IDs of all the<br />

nodes and cluster heads. The manager then<br />

starts time synchronization and estimates<br />

clock drift.<br />

The manager broadcasts beacon signal for<br />

time synchronization.<br />

The manager notifies leaf nodes of timings,<br />

t1, T1, and T2.<br />

All of the nodes save t1, T1, and T2. A timer<br />

is called to periodically check timing to start<br />

sensing.<br />

The receivers reply to inquiry message<br />

about sensing completion.<br />

The manager judges whether to keep<br />

inquiry, restart sensing, or apply<br />

resampling.<br />

All of the sensors start resampling, check<br />

for unknown error. The manager then posts<br />

ProcessInstruction(50).<br />

The manager asks the leaf nodes whether<br />

the resampling was successful.<br />

The leaf nodes reply to the inquiry about<br />

successful resampling.<br />

The manager judges whether to keep<br />

inquiry, restart sensing, or adjust<br />

measurement directions.<br />

Node IDs of cluster members, measurement<br />

channels of each member node<br />

Acknowledgment<br />

Measurement directions of nodes<br />

Measurement directions of cluster member<br />

nodes<br />

NExT parameters such as the number of<br />

FFT data points<br />

Sensing parameters such as Number of<br />

samples<br />

The number of elements, weight of<br />

additional mass, results from the previous<br />

set of measurement, etc.<br />

Node IDs of all the leaf nodes and cluster<br />

heads<br />

Timing to start sensing, i.e. t1, T1, T2, etc.<br />

Answer to inquiry about sensing completion<br />

Answer to inquiry about successful<br />

resampling<br />

135

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!