Structural Health Monitoring Using Smart Sensors - ideals ...
Structural Health Monitoring Using Smart Sensors - ideals ...
Structural Health Monitoring Using Smart Sensors - ideals ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 7.7. Instructions in DCS Code<br />
Instruction Associated Operations Accompanying Information<br />
1<br />
10<br />
2a<br />
2b<br />
The cluster heads save node IDs and<br />
measurement channels of their leaf nodes.<br />
The base station tells the PC that the base<br />
station is ready to receive the next<br />
instruction.<br />
Cluster heads save measurement directions<br />
of member nodes and forward this<br />
information to the leaf nodes.<br />
The leaf nodes save measurement<br />
directions.<br />
4 The cluster heads save NExT parameters.<br />
3c<br />
22-25<br />
26<br />
32<br />
33<br />
34<br />
39<br />
3a<br />
3b<br />
50<br />
51<br />
52<br />
Sensing parameters are saved on cluster<br />
heads.<br />
Received parameters are saved on cluster<br />
heads.<br />
The manager receives node IDs of all the<br />
nodes and cluster heads. The manager then<br />
starts time synchronization and estimates<br />
clock drift.<br />
The manager broadcasts beacon signal for<br />
time synchronization.<br />
The manager notifies leaf nodes of timings,<br />
t1, T1, and T2.<br />
All of the nodes save t1, T1, and T2. A timer<br />
is called to periodically check timing to start<br />
sensing.<br />
The receivers reply to inquiry message<br />
about sensing completion.<br />
The manager judges whether to keep<br />
inquiry, restart sensing, or apply<br />
resampling.<br />
All of the sensors start resampling, check<br />
for unknown error. The manager then posts<br />
ProcessInstruction(50).<br />
The manager asks the leaf nodes whether<br />
the resampling was successful.<br />
The leaf nodes reply to the inquiry about<br />
successful resampling.<br />
The manager judges whether to keep<br />
inquiry, restart sensing, or adjust<br />
measurement directions.<br />
Node IDs of cluster members, measurement<br />
channels of each member node<br />
Acknowledgment<br />
Measurement directions of nodes<br />
Measurement directions of cluster member<br />
nodes<br />
NExT parameters such as the number of<br />
FFT data points<br />
Sensing parameters such as Number of<br />
samples<br />
The number of elements, weight of<br />
additional mass, results from the previous<br />
set of measurement, etc.<br />
Node IDs of all the leaf nodes and cluster<br />
heads<br />
Timing to start sensing, i.e. t1, T1, T2, etc.<br />
Answer to inquiry about sensing completion<br />
Answer to inquiry about successful<br />
resampling<br />
135