02.03.2014 Views

Idaho National Laboratory Cultural Resource Management Plan

Idaho National Laboratory Cultural Resource Management Plan

Idaho National Laboratory Cultural Resource Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 9. (continued).<br />

Project Number<br />

INL <strong>Cultural</strong> <strong>Resource</strong> <strong>Management</strong> Office Archaeological Investigations<br />

Project Title<br />

BEA-07-12 Unmanned Ground Vehicle Test Range<br />

BEA-07-13 Aurora Test at INTEC Substation<br />

BEA-07-14 FY 2007 Ordnance Surveys<br />

BEA-07-15 Instrumentation Cable Cleanup at PBF<br />

BEA-07-16 FY 2007 Long Term Ecological Surveys<br />

BEA-07-17 Offroad Access between PBF and INL CERCLA Disposal Facility<br />

BEA-07-18 <strong>National</strong> Security Test Range Developments<br />

BEA-07-19 Gamma Spec Calibration Pad at MFC<br />

BEA-07-20 Accelerator Signs around PER-612<br />

BEA-07-21 RTC Parking Lot Expansion<br />

BEA-07-22 Tank Removal at CFA and PBF<br />

BEA-07-23 RWMC Fire Upgrade<br />

BEA-07-24 Beacon Test Site East of MFC<br />

BEA-07-25 Remote Handled Waste Disposition Project<br />

BEA-07-26 Firing Range Safety Fan Expansion at CFA and MFC<br />

BEA-07-27 2007 Fire Prevention (mowing)<br />

BEA-07-28 EBR-I Maintenance (deep well)<br />

BEA-07-29 New MFC Guard Post<br />

BEA-07-30 Twin Buttes and Moonshiners Fires<br />

BEA-07-31 INTEC Batch <strong>Plan</strong>t Improvements<br />

BEA-07-32 Section 110<br />

BEA-07-33 Cell Tower at Drive By Test Facility (Cell Site 8)<br />

BEA-07-34 New Lights at the Puzzle<br />

Fiscal Year 2008<br />

BEA-08-01 New Poles at CFA Substation<br />

BEA-08-02 CERCLA Misc Sites Monitoring and Remediation<br />

BEA-08-03 <strong>National</strong> Security Test Range Safety Fan and Other Developments<br />

BEA-08-04 Research and Education Campus Development in <strong>Idaho</strong> Falls<br />

BEA-08-05 Section 110<br />

BEA-08-06 U. S. Geological Survey FY 08 Drilling Program<br />

BEA-08-07 Next Generation Nuclear <strong>Plan</strong>t Contained Test Facility Siting Study<br />

BEA-08-08 INL Temporary Wind Towers<br />

BEA-08-09 Power Line Testing (Trail Mix)<br />

BEA-08-10 Mountain States Intertie Siting Study<br />

BEA-08-11 CFA and MFC Gun Range Surface Danger Zone Extensions<br />

BEA-08-12 MFC Search Station Power Cable<br />

430

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!