02.03.2014 Views

Idaho National Laboratory Cultural Resource Management Plan

Idaho National Laboratory Cultural Resource Management Plan

Idaho National Laboratory Cultural Resource Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 11. (continued).<br />

Project<br />

Number<br />

INL <strong>Cultural</strong> <strong>Resource</strong> <strong>Management</strong> Office Architectural Investigations<br />

Project Title<br />

06-06 Modifications to MFC Bldg. 774 for Protective Force Consolidation Support –<br />

eligible; Cat. 2<br />

06-07 Maintenance of Stream Gauging Sites at the INL-exempt<br />

06-08 CPP-603 cold, dark, dry – eligible; 1998 MOA; 2004 PA<br />

06-09 TAN Shielded Locomotive move to EBR I – SHPO and NPS concurrence<br />

06-10 CF-603 Autopsy/Surgical Room and Contents – building ineligible; surgical tableeligible<br />

and moved to interim storage at CFA<br />

06-11 TAN-630 and TAN-650 LOFT-NHPA consultation completed; MOA in place and<br />

mitigation completed<br />

06-12 TRA-603 (MTR) - eligible; NHPA mitigation completed<br />

06-13 TAN-607 Hot Shop – eligible; was included in MOA with LOFT and MTR and<br />

NHPA mitigation completed<br />

06-14 CPP-651 temporary ducting, equipment, and a new door to room 107-eligible; no<br />

adverses impact<br />

06-15 INTEC – CPP-601 PEW Isolation and Reroute-eligible; 1998 MOA and 2004 PA<br />

06-16 MFC FASB glove box project – eligible; no adverse impact<br />

07-01 Removal of ZPPR IV Compressor - Exempt<br />

07-02 Replacement of walkway atop and external to CPP-646, CPP-647, CPP-747 – no<br />

adverse impact<br />

07-03 Removal of TAN-607A – eligible; mitigation completed<br />

07-04 Partial demolition/remodel of TRA-609 – eligible; mitigation completed<br />

07-05 Hood relocated from CF-689 to CF-666 – exempt activity<br />

07-06 WAASP System Installation at MFC – eligible; mitigation completed<br />

07-07 Above ground cable removal between PBF-612 and PBF-619 -exempt<br />

07-08 Installation of fire suppression system in TRA-660 – eligible; mitigation completed<br />

07-09 Removal of TRA-615 – exempt property<br />

07-10 TRA-608 and TRA-609 upgrades – eligible; mitigation completed<br />

07-11 TRA-630 tank system closure – ineligible; exempt activity<br />

07-12 TAN-629 ventilation upgrade – eligible; exempt activity<br />

07-13 HFEF Metal Waste Form (MWF) Furnace Installation and Operations – eligible;<br />

exempt activity<br />

07-14 Replace EBR I septic system – NHL; no adverse impact<br />

07-15 TRA-670 Reactivation of Pressurized Water Loop 2A – eligible; exempt activity<br />

07-16 CF-668 Exterior painting – eligible; exempt activity<br />

07-17 Oil cedar shingles on CFA World War II roofs – eligible; no adverse impact<br />

449

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!