4. Plan Overview<br />

Plan Area-wide,<br />

where appropriate<br />

Table 4-3<br />

Facility Summary Update<br />

Projects Completed<br />

since FY 2009-2010<br />

Wind warning light upgrades<br />

Solar gates at four entrance areas<br />

None<br />

Future Planned Projects<br />

<strong>San</strong> <strong>Luis</strong> Creek<br />

Medeiros<br />

Water treatment plant and lift station<br />

upgrades at group and day use areas<br />

Completion of ADA updates to three<br />

new vault toilets<br />

Install an ADA fishing pier near <strong>the</strong><br />

boat ramp area<br />

Upgrade boat ramp<br />

None<br />

Basalt Water treatment plant upgrade Launch ramp<br />

Dinosaur Point None Launch ramp parking area upgrades<br />

Los Banos Creek New replacement water tanks None<br />

Four new ADA day-use picnic sites<br />

O’Neill Forebay<br />

Installation of one new wind warning<br />

light tower and light<br />

ADA trail improvements<br />

None<br />

Source: CSP Four Rivers Sector 2012.<br />

Table 4-2 attempts to quantify <strong>the</strong> approximate number of visitors that can be<br />

accommodated at any one time at each use area (see <strong>the</strong> Total <strong>for</strong> each use area<br />

under “Existing Facilities”). As monthly attendance figures by use area are not<br />

available <strong>for</strong> recent fiscal years, it is not possible to quantify when and how often<br />

capacity is exceeded. However, a 2008 survey of CSP staff provided <strong>the</strong><br />

following capacity recommendations (Aukerman, Haas, and Schuster 2008):<br />

• <strong>San</strong> <strong>Luis</strong> <strong>Reservoir</strong> – Increase opportunities <strong>for</strong> boat mooring and boat<br />

rentals; add group camping and day use facilities.<br />

• O’Neill Forebay – Increase group camping capacity, add launch facility,<br />

add restroom at Medeiros Use Area; to accommodate high levels of<br />

visitation on holiday weekends, add day use sites and parking.<br />

• Los Banos Creek <strong>Reservoir</strong> – Add camping and day use facilities to<br />

accommodate high levels of visitation on holiday weekends.<br />

Insufficient data exists to precisely quantify o<strong>the</strong>r parameters such as ecological<br />

or social capacity. However, <strong>the</strong> goals and guidelines outlined in Section 4.2<br />

provide qualitative parameters <strong>for</strong> attaining <strong>the</strong> desired natural and cultural<br />

resource conditions, visitor experiences, and management ef<strong>for</strong>ts that are<br />

compatible with <strong>the</strong> existing and maximum future capacity of <strong>the</strong> Plan Area.<br />

Part of Plan implementation will be to ga<strong>the</strong>r more in<strong>for</strong>mation about visitor<br />

demographics and facility use as well as natural and cultural resource capacity.<br />

This will serve to create a more thorough baseline from which to verify if <strong>the</strong><br />

proposed uses and facilities in this Plan are meeting <strong>the</strong> desired future conditions<br />

4-72 <strong>San</strong> <strong>Luis</strong> <strong>Reservoir</strong> <strong>SRA</strong><br />

<strong>Draft</strong> RMP/GP and <strong>Draft</strong> <strong>EIS</strong>/<strong>EIR</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!