14.05.2014 Views

Draft EIS/EIR for the San Luis Reservoir SRA Resource ...

Draft EIS/EIR for the San Luis Reservoir SRA Resource ...

Draft EIS/EIR for the San Luis Reservoir SRA Resource ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Environmental Analysis<br />

5.4.5.3 Environmental Evaluation<br />

Facilities Expansion and Construction The action alternatives would allow <strong>for</strong><br />

<strong>the</strong> development of additional visitor facilities including day-use, camping,<br />

shoreline and water surface facilities, maintenance, and staff facilities in <strong>the</strong> Plan<br />

Area. The additional development of current use areas (with more facilities or a<br />

change in size of existing facilities) could affect <strong>the</strong> Plan Area’s existing scenic<br />

quality and character by reducing scenic vistas and open landscape character or<br />

damaging scenic resources. In addition, new facilities have <strong>the</strong> potential to create<br />

new sources of light or glare, which could affect day or nighttime views in <strong>the</strong><br />

area. Effects to scenic resources and aes<strong>the</strong>tics would vary by alternative as<br />

follows:<br />

• Alternative 1, <strong>the</strong> No Action/No Project Alternative, would not involve<br />

expansion of existing facilities or construction of new facilities.<br />

Alternative 1 would have no impact to scenic resources or aes<strong>the</strong>tics.<br />

• Alternative 2 would include <strong>the</strong> fewest physical additions and visitor use<br />

modifications of <strong>the</strong> action alternatives. Constructing a multipurpose<br />

building <strong>for</strong> group events and interpretive programs at <strong>San</strong> <strong>Luis</strong> Creek Use<br />

Area and expanding existing campgrounds at <strong>San</strong> <strong>Luis</strong> Creek, Los Banos<br />

Creek, and Basalt use areas could have minor adverse impacts to scenic<br />

resources, including new sources of light and glare. These facilities are not<br />

anticipated to affect views from SR 152, a designated scenic highway.<br />

Goals RES-S1 and RES-S5 and <strong>the</strong>ir associated guidelines (Section<br />

4.2.1.1) would reduce visual impacts from new or expanded facilities,<br />

although minor adverse impacts could remain.<br />

• Alternative 3 would allow <strong>for</strong> several additional features and facilities that<br />

have <strong>the</strong> potential to affect scenic resources and aes<strong>the</strong>tics. This<br />

alternative would allow <strong>for</strong> larger expansions of campgrounds than<br />

Alternative 2 (including 30 new tent sites at Dinosaur Point and up to 20<br />

tent/RV sites on <strong>the</strong> South Shore of Los Banos Creek <strong>Reservoir</strong>);<br />

expansion of <strong>the</strong> boat launch at <strong>San</strong> <strong>Luis</strong> Creek Use Area; and<br />

construction of a ranger station, staff housing, and maintenance facilities<br />

at Los Banos Creek Use Area. At <strong>the</strong> OHV Use Area, Alternative 3 would<br />

provide <strong>for</strong> <strong>the</strong> addition of six primitive campsites, minor additions to<br />

existing facilities such as shade ramadas, and potential future expansion of<br />

<strong>the</strong> area if new property becomes available. Expansion of <strong>the</strong> OHV Use<br />

Area would involve <strong>the</strong> construction and use of unpaved OHV trails on<br />

adjacent undeveloped lands. The majority of <strong>the</strong> proposed development<br />

under Alternative 3 would be in FC zones, where existing facilities are<br />

concentrated. None<strong>the</strong>less, <strong>the</strong>se actions would have minor adverse<br />

impacts to scenic resources and aes<strong>the</strong>tics, including new sources of light<br />

and glare; minor changes in <strong>the</strong> Plan Area viewshed from SR 152, a<br />

designated scenic highway; and increased visibility of human-made<br />

features and reminders of human presence in a primarily undeveloped<br />

environment, both from land and water. Goals RES-S1 and RES-S5 and<br />

<strong>the</strong>ir associated guidelines would reduce visual impacts from new or<br />

expanded facilities, although minor adverse impacts could remain.<br />

<strong>San</strong> <strong>Luis</strong> <strong>Reservoir</strong> <strong>SRA</strong> 5-47<br />

<strong>Draft</strong> RMP/GP and <strong>Draft</strong> <strong>EIS</strong>/<strong>EIR</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!