3. Planning Influences<br />

Use Area. Reclamation will determine <strong>the</strong> location <strong>for</strong> a second renewable energy<br />

site in coordination with CSP and DWR.<br />

3.3.15.2 Quinto Solar Photovoltaic Project<br />

The proposed Quinto Solar Photovoltaic (PV) Project includes <strong>the</strong> construction<br />

and operation of a 110-megawatt (MW) solar PV electrical generating facility and<br />

associated infrastructure on approximately 1,012 acres. The project would be<br />

constructed on unincorporated land directly north and nor<strong>the</strong>ast of O’Neill<br />

Forebay and adjacent to <strong>San</strong> <strong>Luis</strong> Creek Use Area and <strong>San</strong> <strong>Luis</strong> Creek<br />

Campground. The project site and much of <strong>the</strong> surrounding land is designated as<br />

Agricultural in <strong>the</strong> Merced County General Plan. The project development<br />

footprint would be approximately 528 acres, and <strong>the</strong> rest of <strong>the</strong> site would remain<br />

as open space.<br />

The proposed project would construct approximately 306,720 solar PV panels<br />

mounted on trackers that rotate to follow <strong>the</strong> sun. In addition to <strong>the</strong> solar panels,<br />

<strong>the</strong> proposed project would include an electrical substation that would be owned<br />

by SunPower, a PG&E switch station, overhead and underground utility lines, a<br />

5,000 square-foot operations and maintenance building, unpaved access roads,<br />

security fencing, and a temporary staging area. The project includes a commercial<br />

sheep grazing plan <strong>for</strong> 829 acres of <strong>the</strong> project site, primarily <strong>for</strong> food and fiber<br />

production and secondarily <strong>for</strong> vegetation reduction.<br />

The proposed project would require approval of a conditional use permit and<br />

removal of <strong>the</strong> project site from <strong>the</strong> county’s Agricultural Preserve. Construction<br />

would generally occur during daylight hours with some limited night and<br />

weekend construction. Project construction is proposed to begin in mid-2013 and<br />

conclude in late 2014 over a period of approximately 16 months.<br />

The County of Merced is <strong>the</strong> lead agency <strong>for</strong> <strong>the</strong> project’s <strong>EIR</strong>. A Notice of<br />

Preparation of an <strong>EIR</strong> was released in December 2010 and requested agencies,<br />

organizations and individuals to provide input on <strong>the</strong> scope and content of <strong>the</strong><br />

<strong>EIR</strong>. A <strong>Draft</strong> <strong>EIR</strong> <strong>for</strong> <strong>the</strong> project was issued in March 2012.<br />

3.3.15.3 O<strong>the</strong>r Projects<br />

Several o<strong>the</strong>r renewable energy projects are proposed within 10 miles of <strong>the</strong> <strong>San</strong><br />

<strong>Luis</strong> <strong>Reservoir</strong> <strong>SRA</strong>. Those projects include SPG Solar/Ingomar Project (1 MW<br />

solar PV power generation facility located approximately 6 miles east); Leo/Vega<br />

Solar Project (150 MW solar PV generating facility located approximately 10<br />

miles south); and SR Solis in <strong>the</strong> City of Gustine (located approximately 8 miles<br />

nor<strong>the</strong>ast of <strong>the</strong> Plan Area) (Cali<strong>for</strong>nia Energy Commission 2011).<br />

Just west of <strong>the</strong> Plan Area, wind turbines have been operating on ridgelines on <strong>the</strong><br />

eastern side of Pacheco State Park since 1980. The original owner of <strong>the</strong> lands<br />

that are now Pacheco State Park, Paula Fatjo, established a land lease with a wind<br />

turbine company. Upon her passing in 1995, <strong>the</strong> land was willed to CSP <strong>for</strong> <strong>the</strong><br />

purposes of establishing Pacheco State Park. Today, International Turbine<br />

Research owns and operates 167 wind turbines that now generate approximately<br />

<strong>San</strong> <strong>Luis</strong> <strong>Reservoir</strong> <strong>SRA</strong> 3-21<br />