14.05.2014 Views

Draft EIS/EIR for the San Luis Reservoir SRA Resource ...

Draft EIS/EIR for the San Luis Reservoir SRA Resource ...

Draft EIS/EIR for the San Luis Reservoir SRA Resource ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Plan Overview<br />

Table 4-1<br />

Proposed Management Actions by Alternative and Area<br />

Element Alt 1 Alt 2 Alt 3 Alt 4<br />

Create additional interpretive programs, including <strong>the</strong>mes described in<br />

Section 4.2.2.3.<br />

• • •<br />

Gonzaga Road Facilities Area<br />

Maintain existing CSP facilities. • • • •<br />

Provide a new visitor’s center within existing facilities.<br />

Romero Visitor’s Center<br />

Continue to offer educational in<strong>for</strong>mation, literature, visitor programs,<br />

viewing stations with telescopes, and restrooms.<br />

• • • •<br />

Consider partnership <strong>for</strong> development of interpretive programs with<br />

DWR.<br />

• • •<br />

Basalt Use Area<br />

Maintain entrance station, four-lane boat launch with a 80-foot<br />

boarding float, parking lot (<strong>for</strong> 278 vehicles or 156 with trailers),<br />

restrooms with flush toilets and showers, chemical toilets, in<strong>for</strong>mation<br />

boards, and wind warning light. Maintain no-ski zone and 10 mph<br />

speed limit on reservoir on ei<strong>the</strong>r side of Goosehead Point.<br />

• • • •<br />

Basalt Quarry to remain closed to public access. • • •<br />

Coordinate with Department of Water <strong>Resource</strong>s (DWR) to allow <strong>for</strong><br />

guided tours of Basalt Quarry.<br />

Maintain trails and interpretive signage. • • • •<br />

•<br />

•<br />

Develop multi-use trail (hiking, cycling, equestrian) to Pacheco State<br />

Park including a backpackers’ camp. Where feasible, provide springfed<br />

water station.<br />

• •<br />

Maintain existing camping area (79 tent/RV sites).<br />

•<br />

Reconfigure 79 tent/RV sites or add sites to allow <strong>for</strong> larger RVs. • • •<br />

Add 30 RV campsites with full hookups. • •<br />

Add hookups to all campsites and add laundry facility and<br />

refreshment stand.<br />

Add group camp to accommodate up to 60 people.<br />

Add group camp to accommodate up to 100 people.<br />

Add alternative overnight lodging such as cabins or yurts.<br />

Add alternative overnight lodging such as cabins or yurts with utilities.<br />

In <strong>the</strong> BC Zone, add backpackers campground with up to 10 tent<br />

sites, and add vault toilets.<br />

Maintain existing campfire center/outdoor ga<strong>the</strong>ring area (<strong>for</strong> approx.<br />

60 people).<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

Upgrade campfire center to accommodate regular programs and<br />

group events.<br />

• •<br />

Replace campfire center with amphi<strong>the</strong>ater to accommodate larger<br />

groups.<br />

•<br />

Coordinate with DWR to explore allowing cycling/fishing on dam. • •<br />

<strong>San</strong> <strong>Luis</strong> <strong>Reservoir</strong> <strong>SRA</strong> 4-45<br />

<strong>Draft</strong> RMP/GP and <strong>Draft</strong> <strong>EIS</strong>/<strong>EIR</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!