5. Environmental Analysis<br />

signage to direct visitors to open Plan Area destinations during<br />

construction. Interpretation <strong>for</strong> visitors of <strong>the</strong> activities, value, and effects<br />

of ongoing construction projects will be included.<br />

• In areas where parking capacity has <strong>the</strong> potential to be exceeded, designate<br />

overflow parking areas that are large enough to accommodate demand.<br />

5.4.8 Utilities and Emergency Services<br />

As described in Section 2.11, utilities in <strong>the</strong> Plan Area include wastewater<br />

facilities, water storage tanks, high-voltage power lines, and propane tanks; and<br />

public services include fire protection, security, and medical aid. New or<br />

expanded facilities could include additional utility infrastructure and potentially<br />

increase demand <strong>for</strong> utilities and public services. The Plan includes goals and<br />

guidelines to reduce or avoid effects to <strong>the</strong>se resources.<br />

5.4.8.1 Impact Summary<br />

The following mechanisms have <strong>the</strong> potential to affect utilities and emergency<br />

services in <strong>the</strong> Plan Area:<br />

• Facilities expansion and construction<br />

• Increased demand <strong>for</strong> emergency services resulting from increased<br />

visitation<br />

• Climate change<br />

5.4.8.2 Impact Criteria (Utilities and Emergency Services)<br />

• Beneficial Impact: Impact that is detectable and that significantly and<br />

positively alters historical or desired conditions of <strong>the</strong> utilities and public<br />

services. There is no CEQA equivalent to a NEPA beneficial impact.<br />

• No Impact: Impact to utilities and public services that cannot be detected.<br />

• Minor Adverse Impact: Impact to utilities and public services that is<br />

detectable but does not interfere with Plan Area goals. This is equivalent<br />

to a CEQA less than significant impact.<br />

• Major Adverse Impact: Impact to utilities and public services that is<br />

detectable and negatively alters historical baseline or desired conditions.<br />

Major adverse impacts would contribute to <strong>the</strong> deterioration of safe<br />

conditions in <strong>the</strong> Plan Area, <strong>the</strong> public’s enjoyment of Plan Area, or would<br />

interfere with Plan Area goals <strong>for</strong> providing services. A major adverse<br />

impact is equivalent to a CEQA significant impact, which would result<br />

from one or more of <strong>the</strong> following:<br />

− Exceedance of wastewater treatment requirements of <strong>the</strong> Cali<strong>for</strong>nia<br />

Regional Water Quality Control Board;<br />

− The need <strong>for</strong> new water or wastewater treatment facilities or expansion<br />

of existing facilities, <strong>the</strong> construction of which could cause significant<br />

environmental effects;<br />

− The need <strong>for</strong> new storm water drainage facilities or expansion of<br />

existing facilities, <strong>the</strong> construction of which could cause significant<br />

environmental effects;<br />

<strong>San</strong> <strong>Luis</strong> <strong>Reservoir</strong> <strong>SRA</strong> 5-61<br />

<strong>Draft</strong> RMP/GP and <strong>Draft</strong> <strong>EIS</strong>/<strong>EIR</strong>