Draft EIS/EIR for the San Luis Reservoir SRA Resource ...
Draft EIS/EIR for the San Luis Reservoir SRA Resource ...
Draft EIS/EIR for the San Luis Reservoir SRA Resource ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4. Plan Overview<br />
provide <strong>for</strong> addressing conflicts between hunting and o<strong>the</strong>r uses on lands<br />
surrounding <strong>the</strong> Dinosaur Point Use Area.<br />
Infrastructure and Operations. Under Alternative 2, <strong>the</strong> managing agencies<br />
would work with Caltrans to identify alterations to existing roadways, including<br />
improved turning lanes on SR 152 and SR 33 at Plan Area entrances, and<br />
improved access routes between SR 152 and Basalt Use Area, and between SR<br />
152 and <strong>San</strong> <strong>Luis</strong> Creek Use Area. The managing agencies would also work with<br />
o<strong>the</strong>r agencies to improve signage outside of <strong>the</strong> Plan Area and at Plan Area entry<br />
points. The road at <strong>the</strong> entrance station to Los Banos Creek Use Area would be<br />
improved to address periodic flooding issues from heavy rains and federally<br />
mandated water releases, which result in occasional closure of <strong>the</strong> area’s access<br />
road. The improvements would allow uninterrupted access to <strong>the</strong> reservoir.<br />
Management actions related to circulation are consistent with Goals OPS-A1<br />
through OPS-A4 (Plan Area Access and Circulation).<br />
Utility upgrades would be necessary over time to adhere to current standards.<br />
Upgrades would include wear items on specific utilities, replacement of broken or<br />
damaged equipment, and replacing older equipment that is determined unsafe, as<br />
generally directed by Goal OPS-U1 (Utilities). Existing lighting would be<br />
maintained and repaired using energy-efficient fixtures. Carbon-reducing features<br />
such as solar panels would be added. O<strong>the</strong>rwise, operations and management<br />
facilities would not be improved or expanded. No new operational and<br />
management facilities would be constructed at Los Banos Creek Use Area.<br />
Water Operations. In Alternative 2 and <strong>the</strong> o<strong>the</strong>r action alternatives, <strong>the</strong><br />
managing agencies would provide in<strong>for</strong>mation about to how obtain wind and<br />
water level in<strong>for</strong>mation (Goal RES-C1, Climate). Visitor access to sensitive areas<br />
such as dams and o<strong>the</strong>r water conveyance facilities and structures would be<br />
clarified (Goal WA-A1, Restriction of Access to Dams and Power Facilities).<br />
4.4.3 Alternative 3: Moderate New Access and Development<br />
The primary components of this alternative are similar to those in Alternative 2<br />
(Section 4.4.2), except Alternative 3 proposes additional development to<br />
accommodate visitor use and programs. The locations of new facilities and<br />
features of Alternative 3 are shown on Map 10 and listed in Table 4-1. The<br />
following description of Alternative 3 is organized by <strong>the</strong> planning areas defined<br />
in Section 3.4.<br />
<strong>Resource</strong> Management. Alternative 3 proposes several physical additions and<br />
visitor use modifications, primarily on <strong>SRA</strong> lands within <strong>the</strong> Plan Area. The<br />
4-58 <strong>San</strong> <strong>Luis</strong> <strong>Reservoir</strong> <strong>SRA</strong><br />
<strong>Draft</strong> RMP/GP and <strong>Draft</strong> <strong>EIS</strong>/<strong>EIR</strong>