<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />
Preparing the<br />
Equipment Rack<br />
To prepare for the installation of the <strong>SwitchBlade</strong> <strong>x3112</strong> Switch into your<br />
equipment rack, perform the following procedure:<br />
Caution<br />
Due to its weight, the chassis should be mounted as low as possible<br />
in the equipment rack to maximize vertical stability.<br />
1. Reserve 311.1 mm (12.25“) of vertical rack space for the installation of<br />
the AT-SB<strong>x3112</strong> Chassis as shown in Figure 27.<br />
In addition, do not mount any other equipment within 152.4 mm (6”)<br />
above this space during installation. This additional vertical space is<br />
temporary and allows you enough room to lift and tilt the chassis into<br />
its position in the equipment rack without hitting other equipment - see<br />
Figure 31 on page 60. When the chassis is installed, this additional<br />
space is available for any other equipment that you may install.<br />
463.5 mm (18.25”)<br />
311.1 mm (12.25“)<br />
152.4 mm (6”0)<br />
Figure 27. Reserving Vertical Rack Space<br />
55