<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />

Preparing the<br />

Equipment Rack<br />

To prepare for the installation of the <strong>SwitchBlade</strong> <strong>x3112</strong> Switch into your<br />

equipment rack, perform the following procedure:<br />

Caution<br />

Due to its weight, the chassis should be mounted as low as possible<br />

in the equipment rack to maximize vertical stability.<br />

1. Reserve 311.1 mm (12.25“) of vertical rack space for the installation of<br />

the AT-SB<strong>x3112</strong> Chassis as shown in Figure 27.<br />

In addition, do not mount any other equipment within 152.4 mm (6”)<br />

above this space during installation. This additional vertical space is<br />

temporary and allows you enough room to lift and tilt the chassis into<br />

its position in the equipment rack without hitting other equipment - see<br />

Figure 31 on page 60. When the chassis is installed, this additional<br />

space is available for any other equipment that you may install.<br />

463.5 mm (18.25”)<br />

311.1 mm (12.25“)<br />

152.4 mm (6”0)<br />

Figure 27. Reserving Vertical Rack Space<br />