SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SBx31CFC<br />
SYS STATUS<br />
M/S<br />
PSU<br />
FAN<br />
M/S<br />
PSU<br />
FAN<br />
SD<br />
SBx STATUS<br />
0 1<br />
2 3<br />
4 5<br />
6 7<br />
8 9<br />
10 11<br />
READY BUSY FAULT<br />
L/A<br />
10/100/1000Base-T<br />
CONSOLE<br />
RS-232<br />
SBx31CFC<br />
SYS STATUS<br />
M/S<br />
PSU<br />
FAN<br />
MASTER<br />
SLAVE<br />
NORMAL<br />
FAULT<br />
NORMAL<br />
FAULT<br />
M/S<br />
PSU<br />
SD<br />
4<br />
5<br />
SBx STATUS<br />
FAN<br />
0 1<br />
2 3<br />
4 5<br />
6 7<br />
8 9<br />
10 11<br />
4<br />
READY BUSY FAULT<br />
5<br />
CFC<br />
L/A<br />
10/100/1000Base-T<br />
CONSOLE<br />
RS-232<br />
<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />
5. Remove the battery insulator between the battery and the battery clip<br />
by pulling out the insulator tab as shown in Figure 47.<br />
MASTER<br />
SLAVE<br />
NORMAL<br />
FAULT<br />
NORMAL<br />
FAULT<br />
RESET<br />
CFC<br />
NET MGMT<br />
1000 LINK ACT<br />
10/100 LINK ACT<br />
1916<br />
Figure 47. Removing the Battery Insulator<br />
6. Align the AT-SBx31CFC Management Fabric Card with the internal<br />
chassis card guides in the selected slot of the AT-SB<strong>x3112</strong> Chassis.<br />
Figure 48 shows the AT-SBx31CFC Card being aligned in slot 4.<br />
4<br />
2<br />
4<br />
6<br />
6<br />
8<br />
10<br />
1823<br />
RESET<br />
NET MGMT<br />
1000 LINK ACT<br />
10/100 LINK ACT<br />
Figure 48. Aligning the AT-SBx31CFC Card in the Chassis Slot<br />
73