SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />
6. Move the locking handle of the power supply to the locked or down<br />
position as displayed in Figure 45.<br />
P<br />
O<br />
E<br />
AC<br />
DC<br />
FAULT<br />
P<br />
O<br />
E<br />
SBx3165<br />
PoE<br />
POWER<br />
0<br />
1887<br />
Figure 45. Locking the Handle on the AT-SBx3165 PoE Power Supply<br />
7. If you are installing a second AT-SBx3165 PoE Power Supply, remove<br />
the Blank Panel from slot B (see Figure 39 on page 65) and store it in a<br />
secure place.<br />
8. Install the second AT-SBx3161 System Power Supply into slot B by<br />
repeating steps 3 through 7.<br />
The next step in the installation is to install the AT-SBx31CFC Fabric<br />
Control Card(s) and the other Ethernet line cards.<br />
71