10.06.2014 Views

SwitchBlade x3112 Installation Guide - Allied Telesis

SwitchBlade x3112 Installation Guide - Allied Telesis

SwitchBlade x3112 Installation Guide - Allied Telesis

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />

6. Move the locking handle of the power supply to the locked or down<br />

position as displayed in Figure 45.<br />

P<br />

O<br />

E<br />

AC<br />

DC<br />

FAULT<br />

P<br />

O<br />

E<br />

SBx3165<br />

PoE<br />

POWER<br />

0<br />

1887<br />

Figure 45. Locking the Handle on the AT-SBx3165 PoE Power Supply<br />

7. If you are installing a second AT-SBx3165 PoE Power Supply, remove<br />

the Blank Panel from slot B (see Figure 39 on page 65) and store it in a<br />

secure place.<br />

8. Install the second AT-SBx3161 System Power Supply into slot B by<br />

repeating steps 3 through 7.<br />

The next step in the installation is to install the AT-SBx31CFC Fabric<br />

Control Card(s) and the other Ethernet line cards.<br />

71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!