Chapter 2: <strong>Installation</strong><br />
3. Position the transceiver with the label facing up.<br />
4. Slide the transceiver into the slot until it clicks into place as shown in<br />
Figure 56.<br />
1000 LINK<br />
8 10<br />
3 5 7 9 11<br />
2031<br />
Figure 56. Inserting the SFP Transceiver<br />
5. Verify that the handle on the SFP transceiver is in the upright position,<br />
as shown in Figure 57, to prevent inadvertently removing the<br />
transceiver.<br />
6. Remove the protective cover from the SFP transceiver, as shown in<br />
Figure 57.<br />
1000 LINK<br />
8 10<br />
3 5 7 9 11<br />
2032<br />
Figure 57. Removing the SFP Transceiver Protective Cover<br />
7. Repeat this procedure to install other SFP transceivers<br />
8. Go to “Cabling the Twisted-Pair or Fiber Optic Ports” on page 87 for<br />
installation cabling guidelines in the SFP transceiver ports.<br />