10.06.2014 Views

SwitchBlade x3112 Installation Guide - Allied Telesis

SwitchBlade x3112 Installation Guide - Allied Telesis

SwitchBlade x3112 Installation Guide - Allied Telesis

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 2: <strong>Installation</strong><br />

3. Position the transceiver with the label facing up.<br />

4. Slide the transceiver into the slot until it clicks into place as shown in<br />

Figure 56.<br />

1000 LINK<br />

8 10<br />

3 5 7 9 11<br />

2031<br />

Figure 56. Inserting the SFP Transceiver<br />

5. Verify that the handle on the SFP transceiver is in the upright position,<br />

as shown in Figure 57, to prevent inadvertently removing the<br />

transceiver.<br />

6. Remove the protective cover from the SFP transceiver, as shown in<br />

Figure 57.<br />

1000 LINK<br />

8 10<br />

3 5 7 9 11<br />

2032<br />

Figure 57. Removing the SFP Transceiver Protective Cover<br />

7. Repeat this procedure to install other SFP transceivers<br />

8. Go to “Cabling the Twisted-Pair or Fiber Optic Ports” on page 87 for<br />

installation cabling guidelines in the SFP transceiver ports.<br />

80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!