SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1<br />
ESD<br />
3<br />
S<br />
Y<br />
S<br />
T<br />
E<br />
M<br />
SBx31FAN<br />
5<br />
7<br />
POWER<br />
9<br />
11<br />
Chapter 2: <strong>Installation</strong><br />
A<br />
1841<br />
Factory Installed - Flush with Rack Rails<br />
B<br />
“Dim X”<br />
C D E<br />
“Dim X” “Dim X” “Dim X”<br />
Figure 29. Rack Mounting Bracket Locations<br />
Note<br />
If you elect to mount the rack mount brackets in position “E”, the two<br />
chassis screws from the bottom-middle section of the chassis must<br />
be re-installed in the front where the rack mount bracket screws<br />
were originally as displayed in Figure 29.<br />