10.06.2014 Views

SwitchBlade x3112 Installation Guide - Allied Telesis

SwitchBlade x3112 Installation Guide - Allied Telesis

SwitchBlade x3112 Installation Guide - Allied Telesis

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 3: Troubleshooting<br />

AT-SBx31CFC Fabric Control Card PSU Fault LED Flashing Amber<br />

Check the PSU System Status LED on the front of the AT-SBx31CFC card<br />

for a solid green or flashing amber status. A flashing amber status LED<br />

indicates a FAULT condition on one or more power supplies.<br />

Check each Fault LED on each AT-SBx3161 System Power Supply and<br />

AT-SBx3165 PoE Power Supply to see which one(s) is solid amber and<br />

then do the following:<br />

<br />

You can obtain the current status for each power supply by using the<br />

Switchblade <strong>x3112</strong> Management Software by entering the following<br />

commands:<br />

officer SEC>> SHOW PSU<br />

officer SEC>> SHOW PSU FULL<br />

Contact <strong>Allied</strong> <strong>Telesis</strong> Technical Support for further assistance. Please<br />

report the power supply fault condition and the information obtained<br />

from the SHOW PSU and SHOW PSU FULL commands.<br />

<br />

If the affected power supply needs to be replaced, remove it and install<br />

a replacement power supply. Refer to “Installing the AT-SBx3161<br />

System Power Supply” on page 65.<br />

Note<br />

The AT-SBx3161 System Power Supply and AT-SBx3165 PoE<br />

Power Supply are hot swappable when used in a redundant<br />

configuration. This allows the <strong>SwitchBlade</strong> <strong>x3112</strong> to continue to<br />

operate while you exchange power supplies.<br />

96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!