<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />

Adjusting the<br />

Brackets<br />

Before installing the AT-SB<strong>x3112</strong> Chassis, you need to determine where<br />

the horizontal position of the chassis front panel will be relative to the<br />

vertical rack rails. The AT-SB<strong>x3112</strong> Chassis rack mounting brackets come<br />

installed from the factory so that the chassis is flush with the rack rails after<br />

installation. See position “A” in Figure 29 on page 58.<br />

You may decide to extend (positions “B” through “E” in Figure 29 on page<br />

58) or recess (position “F” in Figure 30 on page 59) the horizontal position<br />

of the chassis relative to the rack mounting rails. You can do this by<br />

removing both rack mounting rails and re-attaching them in the<br />

appropriate holes on each side of the chassis. The dimension (X) between<br />

the front panel and the rack rails is given in Table 16 for each rack<br />

mounting bracket position.<br />

Table 16. Front Panel to Rack Rail Dimensions<br />

Figure #<br />

Front Panel Position<br />

Dimension X<br />

Front Panel to Rack Rail<br />

29 A<br />

(Factory Installed - Flush)<br />

29 B<br />

(Recessed)<br />

3.69 mm (0.145 in)<br />

-27.39 mm (-1.078 in)<br />

29 C 27.39 mm (1.078 in)<br />

29 D 47.71 mm (1.878 in)<br />

29 E 140.85 mm (5.545 in)<br />

30 F<br />

(Reverse Position)<br />

374.16 mm (14.731 in)<br />

57