SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />
Adjusting the<br />
Brackets<br />
Before installing the AT-SB<strong>x3112</strong> Chassis, you need to determine where<br />
the horizontal position of the chassis front panel will be relative to the<br />
vertical rack rails. The AT-SB<strong>x3112</strong> Chassis rack mounting brackets come<br />
installed from the factory so that the chassis is flush with the rack rails after<br />
installation. See position “A” in Figure 29 on page 58.<br />
You may decide to extend (positions “B” through “E” in Figure 29 on page<br />
58) or recess (position “F” in Figure 30 on page 59) the horizontal position<br />
of the chassis relative to the rack mounting rails. You can do this by<br />
removing both rack mounting rails and re-attaching them in the<br />
appropriate holes on each side of the chassis. The dimension (X) between<br />
the front panel and the rack rails is given in Table 16 for each rack<br />
mounting bracket position.<br />
Table 16. Front Panel to Rack Rail Dimensions<br />
Figure #<br />
Front Panel Position<br />
Dimension X<br />
Front Panel to Rack Rail<br />
29 A<br />
(Factory Installed - Flush)<br />
29 B<br />
(Recessed)<br />
3.69 mm (0.145 in)<br />
-27.39 mm (-1.078 in)<br />
29 C 27.39 mm (1.078 in)<br />
29 D 47.71 mm (1.878 in)<br />
29 E 140.85 mm (5.545 in)<br />
30 F<br />
(Reverse Position)<br />
374.16 mm (14.731 in)<br />
57