SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />
Installing the AT-SBx3165 PoE Power Supply<br />
To install the AT-SBx3165 PoE Power Supply, perform the following<br />
procedure:<br />
Note<br />
The label for the AT-SBx3161 System Power Supply model number<br />
is located on the left-hand side of the power supply handle as shown<br />
in Figure 22 on page 43. This power supply may be installed in one<br />
of the two power supply slots on the left-hand side of the chassis -<br />
slots A or B. See Figure 39 on page 65 for the location of these slots.<br />
1. Choose a slot in the chassis for the AT-SBx3165 PoE Power Supply.<br />
You can install the system power supply in either of the two right-hand<br />
slots - A or B. See Figure 39 on page 65 for the location of these slots.<br />
If you want to install the power supply in slot A, remove the blank<br />
power supply panel by lifting the blank panel handle and lifting the<br />
panel out of the slot.<br />
Warning<br />
The AT-SBx3165 PoE Power Supply contains active electronic<br />
devices, which can be damaged by electro-static discharges (ESD).<br />
Follow the procedure given in “Protection Against Electrostatic<br />
Discharge (ESD)” on page 64 to guard against ESD damage when<br />
unpacking and installing these power supplies.<br />
2. Remove the power supply from the shipping package.<br />
Note<br />
Store the packaging material in a safe location. You may use the<br />
original shipping material if you need to return the unit to <strong>Allied</strong><br />
<strong>Telesis</strong>.<br />
3. Ensure that the following hardware components are included in your<br />
package:<br />
– One AT-SBx3165 PoE Power Supply<br />
– One AC power cord<br />
If one of these items is missing or damaged, contact your <strong>Allied</strong> <strong>Telesis</strong><br />
sales representative for assistance.<br />
4. Move the locking handle on the AT-SBx3165 to the unlocked or up<br />
position. See Figure 43 on page 70.<br />
69