SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
SwitchBlade x3112 Installation Guide - Allied Telesis
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SYS STATUS<br />
M/S<br />
PSU<br />
FAN<br />
10/100/1000Base-T<br />
RS-232<br />
<strong>SwitchBlade</strong> <strong>x3112</strong> <strong>Installation</strong> <strong>Guide</strong><br />
9. Finger tighten the two thumbscrews on each side of the card as<br />
displayed in Figure 51 to attach it to the front mounting rails of the<br />
chassis.<br />
0<br />
2<br />
4<br />
SBx31CFC<br />
MASTER<br />
SLAVE<br />
NORMAL<br />
FAULT<br />
NORMAL<br />
FAULT<br />
RESET<br />
M/S<br />
PSU<br />
SD<br />
SBx STATUS<br />
FAN<br />
0<br />
2<br />
4<br />
4<br />
6<br />
8<br />
10<br />
1<br />
3<br />
5<br />
5<br />
7<br />
9<br />
11<br />
CFC<br />
NET MGMT<br />
1000 LINK ACT<br />
10/100 LINK ACT<br />
6<br />
READY BUSY FAULT<br />
L/A<br />
CONSOLE<br />
8<br />
10<br />
1826<br />
Figure 51. Tightening Thumb Screws on the AT-SBx31CFC Card<br />
10. With a # 2 Phillips head screw driver, torque both thumbscrews to<br />
.56 Nm (5 lb-in) maximum.<br />
11. Repeat steps 2 to 9, if you have a second AT-SBx31CFC Fabric<br />
Control Card to install.<br />
12. For installation of the Ethernet cable to the NET MGMT port, refer to<br />
the guidelines in “Cabling the Twisted-Pair or Fiber Optic Ports” on<br />
page 87.<br />
75