19.06.2014 Views

Strategic Deployment Plan - sacog

Strategic Deployment Plan - sacog

Strategic Deployment Plan - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 7.3: Project Sequencing ­ Long Term Projects (10­20 years)<br />

Roseville<br />

Responsible<br />

Agency<br />

Roseville Transit<br />

SACOG<br />

SACOG<br />

SACOG<br />

SACOG<br />

Sacramento County<br />

Sacramento Regional<br />

Transit<br />

City of West Sacramento<br />

City of West Sacramento<br />

City of West Sacramento<br />

City of West Sacramento<br />

City of West Sacramento<br />

Description<br />

Implement arterial dynamic message<br />

signs (DMS)<br />

Fixed Route and Paratransit<br />

Expansion<br />

Deploy in­vehicle or handheld<br />

technology to monitor external<br />

conditions to provide route planning<br />

and guidance.<br />

Deploy an ISP­based system that<br />

develops route planning and<br />

multimodal information.<br />

Deploy a virtual TMC network that<br />

allows rural or remote agencies to<br />

access STARNET via the Internet.<br />

Integrate communications between<br />

freight­rail, Amtrak, and local TMCs<br />

to provide coordination between rail<br />

and roadway traffic.<br />

Deploy in­vehicle equipment and<br />

roadside communications equipment<br />

to collect and monitor travel<br />

conditions.<br />

Retrofit existing communication kits<br />

with upgraded audio system and<br />

automatic interior exterior visual<br />

signs for stop announcements and<br />

train destinations.<br />

Install Trailblazer signs on West<br />

Capitol Ave<br />

Complete signal interconnect<br />

network<br />

Complete wireless traffic signal<br />

network<br />

Complete the upgrade of traffic<br />

signal controllers throughout the City<br />

Complete deployment of CCTV<br />

cameras and associated<br />

communication<br />

Project<br />

Cost<br />

Year<br />

ITS<br />

Vision<br />

TBD TBD 2• 3• 4<br />

TBD 2015 4• 5• 6<br />

TBD 2025 4• 5<br />

TBD 2020 2• 3• 4• 5<br />

TBD 2015 2• 3• 4<br />

TBD 2025 2• 3• 4<br />

TBD 2025 2• 3• 4<br />

TBD 2015 4• 5• 6<br />

$400,000 2015 3• 9<br />

$200,000 2015 2• 3<br />

$100,000 2015 2• 3<br />

$200,000 2015 2• 3<br />

$60,000 per<br />

location<br />

2016 2• 3• 9<br />

097860000 SACOG ITS <strong>Strategic</strong> <strong>Deployment</strong> <strong>Plan</strong><br />

124 Final Report<br />

September 2005

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!