STUDY<br />

AGENCY<br />

City of Elk Grove Intelligent Transportation Systems Master <strong>Plan</strong><br />

City of Elk Grove<br />

DATE November 2004<br />

PURPOSE<br />

SUMMARY<br />

The Elk Grove Intelligent Transportation Master <strong>Plan</strong> Proj ect is to assess<br />

existing traffic signal operations on maj or arterials and to develop a plan to<br />

accommodate future development by providing the groundwork for future<br />

systems integration within the City of Elk Grove and between City systems<br />

and other external systems and agencies including but not limited to the City<br />

of Sacramento, the County of Sacramento, Sacramento Area Council of<br />

Government (SACOG) and Sacramento County Regional Transit. The Master<br />

<strong>Plan</strong> contains a concept plan as well as phased implementation plan.<br />

The report includes an existing needs analysis, technology analysis,<br />

functional requirements, communications analysis, funding alternatives,<br />

improvements recommendations, and an implementation plan.<br />

RECOMMENDATIONS FROM DOCUMENT<br />

Short-term recommendations for communication and ITS element improvement, include the following:<br />

Connection between Laguna/Bond Master location and Corporation Yard (Corp Yard wiring)<br />

Upgrade City’s existing onstreet system. Replace controllers/cabinets as needed and add system<br />

detectors on all segments (all construction during Phase 2 unless otherwise noted)<br />

Coordinate border signal responsibilities with the County of Sacramento and Caltrans where<br />

applicable<br />

Monitor recommended policy and process for collecting impact fees for ITS purposes or in-kind<br />

equipment/materials. Revise as necessary. Top defray program expenses, continue to require<br />

installation of new/upgraded conduit and equipment as a condition of new development or<br />

redevelopment<br />

Mid-term recommendations include:<br />

Initiate Traffic Management Center (TMC) in new Corporation Yard to manage signals and other<br />

devices (i.e. CCTV, DMS, etc.) (only if not done in the short term)<br />

Interconnect more signalized intersections and system detectors to new traffic control system<br />

Provide new conduit and twisted pair cabling to complete system on various roadways (specified<br />

in report)<br />

Upgrade existing twisted pair communication system to fiber optic cable on various roadways<br />

(specified in report). Add CCTV and system detectors.<br />

Deploy CCTV Cameras at key intersections<br />

Deploy approximately four dynamic message signs (DMS), appropriate locations to be identified<br />

Long-term recommendations include:<br />

Expand fiber optic communications system<br />

Expand CCTV system to include additional portions of Calvine, Sheldon, Bond and Elk Grove Blvd.<br />

as needed<br />

097860000 SACOG ITS <strong>Strategic</strong> <strong>Deployment</strong> <strong>Plan</strong><br />

Existing Conditions Summary Report 050105 50 Task 1.1 – ITS Existing Conditions Report<br />

03/15/05