STUDY<br />

AGENCY<br />

Sacramento Regional ITS Architecture<br />

Sacramento Regional ITS Partnership<br />

DATE June 2001<br />

PURPOSE<br />

The Regional ITS Architecture for the Sacramento area proposes the ideal<br />

synthesis of cross-functional projects and sub-projects to better enhance and<br />

integrate the ITS infrastructure, functions and operations to achieve<br />

immediate and long term regional benefits to the residents of the<br />

Sacramento metropolitan area. Although benefit is realized through the<br />

deployment of individual ITS projects such as signal timing and control, the<br />

real benefit of ITS is achieved through the integration of systems and<br />

institutions. This region is still in the process of accomplishing these goals,<br />

demonstrated by documentation in this Report.<br />

The figure below excerpted from the report summarizes ITS deployments<br />

currently existing or under development:<br />

SUMMARY<br />

RECOMMENDATIONS FROM DOCUMENT<br />

Recommendations in the architecture pertained to ITS planning and institutional issues include:<br />

Member agencies of the ITS Partnership pursue funding for a Regional Information Network that<br />

will allow regional integration or center-to-center communications between all traffic<br />

management and operations centers in the Sacramento area.<br />

A “user needs” study that will represent the result of individual systems review for: City of<br />

Sacramento, City of Roseville, Sacramento Regional Transit District (RT), Sacramento County, City<br />

of Citrus Heights and Caltrans. This study will identify some preliminary costs for systems<br />

integration, identify interface issues perhaps it will identify some additional benefits, preliminary<br />

to the Early <strong>Deployment</strong> <strong>Plan</strong>.<br />

097860000 SACOG ITS <strong>Strategic</strong> <strong>Deployment</strong> <strong>Plan</strong><br />

Existing Conditions Summary Report 050105 52 Task 1.1 – ITS Existing Conditions Report<br />

03/15/05