19.06.2014 Views

Strategic Deployment Plan - sacog

Strategic Deployment Plan - sacog

Strategic Deployment Plan - sacog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 7.6: Projects for ITS Vision Gaps<br />

ITS Vision Objective<br />

Responsible<br />

Agency<br />

Description<br />

Project<br />

Cost<br />

Year<br />

Improve bicycle and<br />

pedestrian mobility and safety<br />

Improve mobility and reliability<br />

for pedestrians and bicycles<br />

Improve mobility and reliability<br />

for pedestrians and bicycles<br />

Improve mobility and reliability<br />

for pedestrians and bicycles<br />

Implement automated<br />

enforcement<br />

Provide traveler information in<br />

accessible formats<br />

Provide traveler information in<br />

accessible formats<br />

Provide traveler information in<br />

accessible formats<br />

Provide ITS education for the<br />

region<br />

Provide ITS education for the<br />

region<br />

All<br />

All<br />

All<br />

All<br />

All<br />

SACOG<br />

SACOG<br />

Sacramento<br />

Regional Transit<br />

SACOG<br />

SACOG<br />

Design and implement surveillance, signal operations,<br />

and detection devices along key bicycle and pedestrian<br />

facilities<br />

Design and implement a bike and walking trip planning<br />

system within transit trip planning system currently<br />

under development<br />

Implement a bike and walking trip planning system<br />

within the 511 system for the region<br />

Install bicycle detection and improve signal timing to<br />

enhance bicycle mobility<br />

Install equipment at intersections other locations to<br />

provide automatic enforcement of traffic violations<br />

Design and implement a voice recognition system<br />

within the region’s 511 system<br />

Design and implement an interactive system within the<br />

region’s 511 system to allow users the option to hear<br />

and read the information in different languages<br />

Design and deploy traveler information kiosks at transit<br />

centers and key transit stops<br />

Develop an ITS education program in the region that<br />

targets key stakeholders including public focus groups,<br />

policymakers and transportation planners<br />

Implement an ITS outreach program including public<br />

and business focus groups and media events<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

097860000 SACOG ITS <strong>Strategic</strong> <strong>Deployment</strong> <strong>Plan</strong><br />

134 Final Report<br />

September 2005

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!