Sacramento Transportation ARea NETwork (STARNET)<br />

Needs Assessment<br />

For new agencies, the following recommendations are presented:<br />

New Agencies (with traffic operations system)<br />

For new agencies with an existing Traffic Operations Center, it is also assumed that an existing video<br />

switcher and viewing system is already in place. If the new agency has devices and traffic data it<br />

would like to make available to the STARNET system, the Adapters and Device Servers (e.g., CCTV,<br />

Signals, DMS) would need to also be developed.<br />

New Agencies (device monitoring only)<br />

For new agencies that desire only device monitoring, a PC capable of web browsing is needed. If<br />

CCTV video-in-a-window viewing is desired, then there will need to be an ATM Network switch and<br />

frame grabber hardware in the PC. If a system of digitizing the CCTV video and making it available to<br />

the Internet is put in place, then the ATM switch and frame grabber would not be necessary to view<br />

CCTV video within the web browser.<br />

Backbone Communications<br />

While not specific to a single agency, a significant commitment is required to support the<br />

communications required for the STARNET deployment. As mentioned in this document, a preliminary<br />

communications analysis must be completed early-on in the design phase to capture the available<br />

options and summarize the costs / benefits associated with each approach. As part of the STARNET<br />

Needs Assessment analysis for each of the participating agencies, an assumption was made that an<br />

ATM communications backbone would be utilized. This was selected as a “ best-case” scenario for<br />

system performance.<br />

There may be other opportunities, which should be explored during the preliminary engineering phase<br />

of this project, to solidify the communications aspect of this project. If budget considerations require<br />

a less costly approach, the functionality of the system may be reduced. However, this must be<br />

assessed as part of the detailed system design process.<br />

097860000 SACOG ITS <strong>Strategic</strong> <strong>Deployment</strong> <strong>Plan</strong><br />

Existing Conditions Summary Report 050105 49 Task 1.1 – ITS Existing Conditions Report<br />