02.01.2015 Views

Airport Master Plan 2012 - City of Waterville

Airport Master Plan 2012 - City of Waterville

Airport Master Plan 2012 - City of Waterville

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

F2: Upgrade and Utilize Old Telford location for FBO operations<br />

Rather than build an entirely new FBO facility, this alternative requires investment to upgrade<br />

and rehabilitate the former FBO facility.<br />

Requires the relocation <strong>of</strong> the <strong>Airport</strong>‟s current Snow Removal Equipment (SRE) facility.<br />

Requires the former Telford apron to be rehabilitated (Apron rehab eligible for AIP funds, thus a<br />

private developer would not be responsible for apron rehabilitation costs).<br />

Current FBO hangar inadequate in size to accommodate large corporate type aircraft.<br />

With access improvements, this alternative <strong>of</strong>fers convenient ground access for FBO clients.<br />

F3: Develop FBO facilities <strong>of</strong>f <strong>of</strong> existing Runway 14 approach end<br />

Requires significant infrastructure development including a ground access road, aircraft apron<br />

and taxiway design and construction.<br />

Would “set the tone” for future airport development along the required associated taxiway.<br />

The <strong>City</strong> <strong>of</strong> <strong>Waterville</strong> Maine<br />

Alternatives Analysis – Page 4-11<br />

<strong>Airport</strong> Solutions Group, LLC & The Louis Berger Group, Inc. December 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!