20.01.2015 Views

Draft National Wind Farm Development Guidelines - July 2010

Draft National Wind Farm Development Guidelines - July 2010

Draft National Wind Farm Development Guidelines - July 2010

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the operational wind farm is aimed at determining what effects the wind farm actually<br />

has.<br />

Table D-1<br />

Phases of bird and bat assessment relative to development and operation of a wind farm<br />

Stage and<br />

methodology<br />

Site Selection<br />

Project Feasibility<br />

Tasks<br />

Initial screening of potential sites to exclude locations of<br />

highest biodiversity values<br />

Task<br />

methodology<br />

location<br />

Bird and bat impact<br />

risk assessment<br />

Determine potential for key species to use the site Page 120<br />

Preliminary assessment of potential for negative effects on<br />

key species due to loss or alienation of habitat<br />

Page 122<br />

Preliminary assessment of potential for fatal turbine<br />

collisions by key species<br />

Page 123<br />

Planning Application<br />

Bird and bat impact<br />

assessment<br />

Construction<br />

Operations<br />

Decommissioning<br />

Quantitative assessment of risk of fatal collisions for key<br />

species<br />

Evaluation of ecological importance of predicted impact<br />

of proposed wind farm design (inherent risk) on population<br />

of key species<br />

Assessment of any reduction or mitigation of impacts that<br />

can be achieved<br />

Evaluation of ecological importance of predicted impact<br />

of revised wind farm design (residual risk) on population of<br />

key species.<br />

Review Environmental Management Plans to ensure<br />

necessary actions and timing for bird and bats are<br />

identified<br />

Determination of actual impacts of the operational wind<br />

farm on key bird & bat populations<br />

Evaluation of adaptive management aimed at further<br />

reducing impacts<br />

Assessment of possible impacts on key bird & bat species<br />

of decommissioning and of re-powering<br />

Page 125<br />

Page 126<br />

Page 128<br />

Page 129<br />

129<br />

Page 130<br />

Page 132<br />

Page 133<br />

Page 118 <strong>Draft</strong> <strong>National</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Development</strong> <strong>Guidelines</strong> – 2 <strong>July</strong> <strong>2010</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!