F.3 Overview of the Methodology<br />
The assessment of potential EMI impacts will require a range of tiered studies to be<br />
undertaken commencing during Project Feasibility and culminating in the Planning<br />
Application stage. After that, some monitoring and mitigation works may need to be<br />
undertaken during the early part of the Operations stage.<br />
An overview of the works that should be considered by the developer is presented in the<br />
table below.<br />
Stage and<br />
methodology<br />
Site Selection<br />
Tasks<br />
Task<br />
methodology<br />
location<br />
- - -<br />
Project Feasibility<br />
Preliminary EMI impact assessment<br />
Preliminary data<br />
collection<br />
Request input from community through consultation<br />
process<br />
Initial review of licensed services in the area<br />
Determine agencies that need to be contacted<br />
Identify whether there are any exclusion zones that may<br />
affect development at the site<br />
Page 172<br />
Potentially affected<br />
services<br />
Preliminary impact<br />
assessment<br />
Identify those services which may be affected Page 175<br />
Undertake preliminary EMI impact assessment Page 177<br />
Planning Application<br />
EMI impact assessment<br />
Detailed EMI<br />
assessment<br />
Collect data for validation Page 177<br />
Consultation with potentially affected operators Page 177<br />
Develop mitigation strategy Page 178<br />
Finalise mitigation strategy Page 179<br />
Construction<br />
Monitoring program<br />
baseline<br />
Mitigation strategy implementation Page 179<br />
Baseline testing Page 179<br />
Monitoring during wind farm construction Page 180<br />
Operations<br />
Operational EMI<br />
monitoring<br />
Compliance monitoring during wind farm operation Page 180<br />
Addressing community complaints during operation Page 180<br />
Confirmation monitoring during wind farm operation Page 180<br />
Decommissioning<br />
Decommissioning<br />
Decision<br />
Addressing community complaints post-decommissioning Page 181<br />
Decommissioning - -<br />
Redevelopment<br />
As per Planning Application, Construction and Operations<br />