If a significant amount of time has passed between the planning assessment for a wind<br />

farm development and the subsequent assessment for a second wind farm in the area,<br />

in the order of 5-10 years or more, and it is considered that the background noise in the<br />

area may have changed over this time, how are noise level limits to be established for<br />

the second wind farm<br />

If the background noise levels are expected to be lower than when the initial noise impact<br />

assessment occurred, they will be hard to measure in the presence of operational noise<br />

from the existing wind farm. In this case, the second wind farm should comply with the<br />

minimum noise level limit across the assessable wind speed range and not increase the<br />

combined level of wind farm noise emission above the established noise level limits.<br />

If background noise levels are expected to be higher, monitoring may be carried out<br />

where this is not influenced by emission from the original wind farm. If this is not possible, the<br />

second wind farm should comply with the minimum noise level limit across the assessable<br />

wind speed range and not increase the combined level of wind farm noise emission<br />

above the established noise level limits.<br />

How should cumulative noise limits be considered where other industrial activity such as<br />

mining, which changes the character of the background noise environment in the area,<br />

commences during the period between wind farm developments<br />

Issues such as this should be thoroughly examined on a case-by-case basis, in close liaison<br />

with the relevant authority. There are likely to be a range of noise emission controls which<br />

may be applicable to the various sound sources and consultation with the relevant<br />

authority will be critical in achieving a satisfactory outcome.<br />

Where another significant sound source commences in an area after the development of<br />

the first wind farm and prior to the second, and this sound source is expected to continue<br />

through the lifetime of both wind farms, it is generally expected that new background<br />

noise level monitoring would not be conducted. However, if new background noise<br />

monitoring was conducted it would be important to ensure that noise emission from the<br />

first wind farm does not significantly contribute to the background noise level at the<br />

monitoring location, and that the noise limits for the new wind farm do not permit<br />

‘creeping noise’.<br />

Where the new sound source is not expected to carry on in the long term, beyond the<br />

lifetime of both wind farms, it is unlikely that any new noise level limits would be established<br />

at relevant receivers.<br />

How should cumulative noise limits be applied to a group of dwellings where the ‘worst<br />

case’ affected dwelling is different for each proposed wind farm<br />

The ‘worst case’ relevant receiver determined for the noise impact assessment of the first<br />

wind farm will likely be exposed to the greatest level of wind farm noise emission from the<br />

first wind farm as well as experiencing the largest change in the ambient noise<br />

environment.<br />

Where an alternative property from the same cluster of receivers is determined to be the<br />

‘worst case’ receiver for the second wind farm the conservative approach, which is<br />

recommended here, is to assume that the second property is exposed to the same noise<br />

emission from the first wind farm as the first worst case receiver. The contribution from the<br />

second wind farm should comply with noise criteria as outlined in Section B.5.2.<br />

<strong>Draft</strong> <strong>National</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Development</strong> <strong>Guidelines</strong> – 2 <strong>July</strong> <strong>2010</strong> Page 63