20.01.2015 Views

Draft National Wind Farm Development Guidelines - July 2010

Draft National Wind Farm Development Guidelines - July 2010

Draft National Wind Farm Development Guidelines - July 2010

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table B-2<br />

Existing state and territory noise level limits<br />

State/<br />

territory<br />

Guidance<br />

document for<br />

assessment<br />

Minimum<br />

noise level<br />

limit*<br />

Penalty<br />

for noise<br />

character<br />

istics<br />

Comments<br />

Australian<br />

Capital<br />

Territory<br />

- - - <strong>Wind</strong> farm guidance has not been<br />

prepared in ACT.<br />

(Details to be confirmed)<br />

New South<br />

Wales<br />

South Australia<br />

Environment<br />

Protection<br />

Authority<br />

Environmental<br />

noise guidelines:<br />

<strong>Wind</strong> farms, 2003<br />

LAeq, 10<br />

minutes<br />

35 dB(A)<br />

5dB<br />

Penalty applies for tonality only. No<br />

other characteristics are assessed<br />

directly.<br />

Northern<br />

Territory<br />

Queenslan<br />

d<br />

- - - There is no specific wind farm<br />

assessment document.<br />

<strong>Development</strong>s would likely be<br />

assessed on a case by case basis.<br />

- - - There is no specific guidance<br />

regarding wind farms.<br />

<strong>Development</strong>s would likely be<br />

assessed on a case by case basis.<br />

NZS6808:1998 and SA <strong>Guidelines</strong><br />

2003 have been referred to<br />

previously.<br />

South<br />

Australia<br />

Tasmania<br />

Victoria<br />

South Australia<br />

Environment<br />

Protection<br />

Authority <strong>Wind</strong><br />

farms<br />

environmental<br />

noise guidelines<br />

2009<br />

Department of<br />

Primary Industries,<br />

Water and<br />

Environment<br />

(Tasmania), Noise<br />

measurement<br />

procedures<br />

manual, 2004<br />

(TNMP)<br />

New Zealand<br />

Standard NZ<br />

6808:1998<br />

Acoustics – the<br />

Assessment and<br />

Measurement of<br />

Sound from <strong>Wind</strong><br />

Turbine<br />

Generators<br />

LA90 35-40dB 5dB Penalty applies for tonality only. No<br />

other characteristics are assessed<br />

directly.<br />

- 5dB General guidance on the<br />

assessment of wind farm noise<br />

emission is provided in the TNMP but<br />

limits are not explicitly stated and<br />

would likely be assessed on a case<br />

by case basis.<br />

A 5dB penalty applies for one<br />

characteristic. The maximum<br />

penalty is 10dB. Amplitude<br />

modulation, Impulsiveness, Low<br />

frequency noise and tonality are<br />

considered.<br />

LA95 40dB 5dB In addition to NZ6808:1998<br />

requirements, specific assessment of<br />

night time noise limits is required.<br />

The maximum penalty for noise<br />

characteristics is 5dB. Amplitude<br />

modulation, impulsiveness and<br />

tonality are considered.<br />

Western<br />

Australia<br />

Environmental<br />

Protection (Noise)<br />

Regulations 1997.<br />

EPA Guidance for<br />

the Assessment of<br />

LA10 35dB<br />

depending<br />

on zoning<br />

5dB<br />

The WA noise regulations specify<br />

adjustments of 5dB for tonality and<br />

modulation and 10dB for<br />

impulsiveness to be added to the LA<br />

Slow level, to a maximum of 15dB.<br />

<strong>Draft</strong> <strong>National</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Development</strong> <strong>Guidelines</strong> – 2 <strong>July</strong> <strong>2010</strong> Page 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!