Bureau of Meteorology<br />

Relevant Telecommunications Carriers including Telstra<br />

Relevant TV broadcasters<br />

The criteria for initiating such contact, any known exclusion zones, the information<br />

each organisation requires, the method of approach and the timeframe for receiving<br />

a response from the assessment by each organisation is tabulated below (excluding<br />

the Department of Defence who have not communicated their requirements).<br />

It is recommended that these organisations are consulted at the beginning of the<br />

Planning Application Stage, however determining whether any known exclusion<br />

zones apply to the development, which organisations are to be contacted, and what<br />

information they require should be done at this stage.<br />

Please note, this information was correct at the time of issue, but these requirements<br />

may change with time.<br />

Air Services Australia<br />

Known exclusion zone<br />

Criteria for notification<br />

Information required<br />

Not specified<br />

Information below is from ASA information sheet “Airport-Related<br />

<strong>Development</strong>s”<br />

• Site plans with the exact location of the proposed activity<br />

• Drawings of Tower Line of Sight to movement areas with apron<br />

boundary clearly defined<br />

• Detailed drawings including:<br />

• exact dimensions<br />

• maximum heights in AHD and the above ground height for all<br />

structures including crane operations<br />

• The exact location of the development, including coordinates<br />

and datum for each structure or crane operation, with:<br />

• coordinates in latitude / longitude or easting / northing<br />

• datum as WGS84 or equivalent (not the airport reference<br />

point datum)<br />

• A description of each structure to be built, including details of<br />

proposed external cladding, materials, and the structure’s<br />

proposed use<br />

• Where possible, MicroStation.dgn files (or AutoCAD) that include<br />

3D wireframes of buildings and tower line-of-sight.<br />

Contact details<br />

Expected timeframe<br />

for evaluation response<br />

Manager, Airport Relations<br />

Air Services Australia, Canberra<br />

Allow 6-8 weeks for the endorsement process.<br />

Bureau of Meteorology<br />

Known exclusion zone<br />

Criteria for notification<br />

Information required<br />

Contact details<br />

Not specified<br />

All wind farms<br />

As a minimum:<br />

• Site location and extent<br />

• Turbine locations and dimensions, including maximum blade tip<br />

height<br />

As Bureau models for assessing interference potential become<br />

more comprehensive, more parameters may be required in the<br />

future.<br />

windfarmenquiries@bom.gov.au<br />

Head Policy and Strategy Section<br />

<strong>Draft</strong> <strong>National</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Development</strong> <strong>Guidelines</strong> – 2 <strong>July</strong> <strong>2010</strong> Page 173

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!