Bureau of Meteorology<br />
Relevant Telecommunications Carriers including Telstra<br />
Relevant TV broadcasters<br />
The criteria for initiating such contact, any known exclusion zones, the information<br />
each organisation requires, the method of approach and the timeframe for receiving<br />
a response from the assessment by each organisation is tabulated below (excluding<br />
the Department of Defence who have not communicated their requirements).<br />
It is recommended that these organisations are consulted at the beginning of the<br />
Planning Application Stage, however determining whether any known exclusion<br />
zones apply to the development, which organisations are to be contacted, and what<br />
information they require should be done at this stage.<br />
Please note, this information was correct at the time of issue, but these requirements<br />
may change with time.<br />
Air Services Australia<br />
Known exclusion zone<br />
Criteria for notification<br />
Information required<br />
Not specified<br />
Information below is from ASA information sheet “Airport-Related<br />
<strong>Development</strong>s”<br />
• Site plans with the exact location of the proposed activity<br />
• Drawings of Tower Line of Sight to movement areas with apron<br />
boundary clearly defined<br />
• Detailed drawings including:<br />
• exact dimensions<br />
• maximum heights in AHD and the above ground height for all<br />
structures including crane operations<br />
• The exact location of the development, including coordinates<br />
and datum for each structure or crane operation, with:<br />
• coordinates in latitude / longitude or easting / northing<br />
• datum as WGS84 or equivalent (not the airport reference<br />
point datum)<br />
• A description of each structure to be built, including details of<br />
proposed external cladding, materials, and the structure’s<br />
proposed use<br />
• Where possible, MicroStation.dgn files (or AutoCAD) that include<br />
3D wireframes of buildings and tower line-of-sight.<br />
Contact details<br />
Expected timeframe<br />
for evaluation response<br />
Manager, Airport Relations<br />
Air Services Australia, Canberra<br />
Allow 6-8 weeks for the endorsement process.<br />
Bureau of Meteorology<br />
Known exclusion zone<br />
Criteria for notification<br />
Information required<br />
Contact details<br />
Not specified<br />
All wind farms<br />
As a minimum:<br />
• Site location and extent<br />
• Turbine locations and dimensions, including maximum blade tip<br />
height<br />
As Bureau models for assessing interference potential become<br />
more comprehensive, more parameters may be required in the<br />
future.<br />
windfarmenquiries@bom.gov.au<br />
Head Policy and Strategy Section<br />
<strong>Draft</strong> <strong>National</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Development</strong> <strong>Guidelines</strong> – 2 <strong>July</strong> <strong>2010</strong> Page 173