Draft National Wind Farm Development Guidelines - July 2010
Draft National Wind Farm Development Guidelines - July 2010
Draft National Wind Farm Development Guidelines - July 2010
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A.6.1 Site selection 28<br />
A.6.2 Project feasibility 30<br />
A.6.3 Planning application 30<br />
A.6.4 Construction 31<br />
A.6.5 Operation 32<br />
A.6.6 Decommissioning 33<br />
A.7 Cumulative Impacts 33<br />
A.8 Practice notes 33<br />
A.8.1 Stakeholder identification checklist 33<br />
A.9 Glossary & acronyms 36<br />
B Noise 37<br />
B.1 Introduction 37<br />
B.2 Recommended form of noise criteria 37<br />
B.2.1 Basic description of issues addressed in the <strong>Guidelines</strong> 37<br />
B.2.2 Issues not addressed in the <strong>Guidelines</strong> 40<br />
B.2.3 Related documents and standards 40<br />
B.3 Overview of the methodology 41<br />
B.4 Task methodologies 44<br />
B.4.1 Project feasibility 44<br />
B.4.2 Planning application 50<br />
B.4.3 Construction 55<br />
B.4.4 Operations 56<br />
B.4.5 Decommissioning 61<br />
B.5 Cumulative impacts 61<br />
B.5.1 Approach to staged development 61<br />
B.5.2 Assessment of staged and cumulative development 62<br />
B.5.3 Cumulative assessment scenarios 62<br />
B.6 Glossary & acronyms 64<br />
B.7 Technical discussion of key concepts/issues 65<br />
B.7.1 Basic acoustic concepts 65<br />
B.7.2 Audible characteristics 66<br />
C Landscape 69<br />
C.1 Introduction 69<br />
C.1.1 Basic description of issues addressed in the <strong>Guidelines</strong> 69<br />
C.1.2 Issues not addressed in the landscape methodology 72<br />
C.1.3 Related documents and standards 72<br />
C.2 Overview of methodologies 73<br />
C.3 Task methodologies 75<br />
C.3.1 Project feasibility/site selection 75<br />
C.3.2 Preliminary landscape assessment 76<br />
C.4 Planning Application 80<br />
C.4.1 Full landscape assessment 80<br />
C.4.2 Visual impact assessment 85<br />
C.4.3 Response to impacts 87<br />
C.5 Construction 89<br />
C.6 Decommissioning 89<br />
C.7 Practice notes 89<br />
C.7.1 Landscape character units 89<br />
C.7.2 Levels of significance 95<br />
Page vi <strong>Draft</strong> <strong>National</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Development</strong> <strong>Guidelines</strong> – 2 <strong>July</strong> <strong>2010</strong>