Environmental Management<br />
Plans<br />
Issues to consider<br />
Noise<br />
Finalisation of wind farm<br />
design<br />
Complaints handling<br />
Address any outstanding issues from the planning permit and<br />
provide associated information to the relevant authority<br />
Finalise the wind farm design, updating any changes to the design<br />
such as:<br />
• finalising turbine type<br />
• finalising wind farm layout<br />
• finalising compliance with noise criteria and requirements for any<br />
noise management setting<br />
Prepare complaints handling procedures for construction, operation<br />
and decommissioning stages<br />
Construction noise monitoring Undertake construction noise monitoring<br />
Birds & Bats<br />
Shadow Flicker<br />
Address incoming complaints (as required)<br />
Review EMPs to ensure necessary actions and timing for bird & bats<br />
are identified<br />
Finalisation of wind farm<br />
design<br />
Micro-siting<br />
Complaints handling<br />
Address any outstanding issues from the planning permit and<br />
provide associated information to the Relevant Authority<br />
Finalise the wind farm design, updating any changes to the design<br />
such as:<br />
• finalising turbine type<br />
• finalising wind farm layout (micro-siting)<br />
Revise shadow flicker modelling following turbine micro-siting.<br />
Prepare complaints handling procedures for operation stage<br />
EMI<br />
Monitoring program baseline<br />
Mitigation strategy implementation<br />
Baseline testing<br />
Monitoring during wind farm construction<br />
Community Consultation<br />
Review and revise detailed consultation and communication plan<br />
Ensure inclusion of complaints handling process<br />
Coordinate appropriate signage and public information access<br />
points<br />
Landscape<br />
Management and mitigation<br />
Ensure all construction is managed within landscape mitigation<br />
outcomes and recommendations after assessment.<br />