20.01.2015 Views

Draft National Wind Farm Development Guidelines - July 2010

Draft National Wind Farm Development Guidelines - July 2010

Draft National Wind Farm Development Guidelines - July 2010

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Environmental Management<br />

Plans<br />

Issues to consider<br />

Noise<br />

Finalisation of wind farm<br />

design<br />

Complaints handling<br />

Address any outstanding issues from the planning permit and<br />

provide associated information to the relevant authority<br />

Finalise the wind farm design, updating any changes to the design<br />

such as:<br />

• finalising turbine type<br />

• finalising wind farm layout<br />

• finalising compliance with noise criteria and requirements for any<br />

noise management setting<br />

Prepare complaints handling procedures for construction, operation<br />

and decommissioning stages<br />

Construction noise monitoring Undertake construction noise monitoring<br />

Birds & Bats<br />

Shadow Flicker<br />

Address incoming complaints (as required)<br />

Review EMPs to ensure necessary actions and timing for bird & bats<br />

are identified<br />

Finalisation of wind farm<br />

design<br />

Micro-siting<br />

Complaints handling<br />

Address any outstanding issues from the planning permit and<br />

provide associated information to the Relevant Authority<br />

Finalise the wind farm design, updating any changes to the design<br />

such as:<br />

• finalising turbine type<br />

• finalising wind farm layout (micro-siting)<br />

Revise shadow flicker modelling following turbine micro-siting.<br />

Prepare complaints handling procedures for operation stage<br />

EMI<br />

Monitoring program baseline<br />

Mitigation strategy implementation<br />

Baseline testing<br />

Monitoring during wind farm construction<br />

Community Consultation<br />

Review and revise detailed consultation and communication plan<br />

Ensure inclusion of complaints handling process<br />

Coordinate appropriate signage and public information access<br />

points<br />

Landscape<br />

Management and mitigation<br />

Ensure all construction is managed within landscape mitigation<br />

outcomes and recommendations after assessment.<br />

<strong>Draft</strong> <strong>National</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Development</strong> <strong>Guidelines</strong> – 2 <strong>July</strong> <strong>2010</strong> Page 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!