Draft National Wind Farm Development Guidelines - July 2010
Draft National Wind Farm Development Guidelines - July 2010
Draft National Wind Farm Development Guidelines - July 2010
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Decommissioning (D2)<br />
Once a decision has been made to decommission the site, then a detailed plan should be<br />
prepared considering the issues of decommissioning in light of the assessment issues and<br />
any relevant conditions of approval.<br />
Given the time period between when the approval was given and the need to<br />
decommission, particular consideration should be given to any regulatory changes that<br />
have occurred in the meantime and the need to address any additional issues.<br />
The likelihood of decommissioning should have been identified in the permit application<br />
along with an expected life of facility and a new permit should not be needed to<br />
undertake this work. In the absence of such a consent, a new application may be required<br />
in order to decommission the facility.<br />
A permit condition should be applied requiring a decommissioning plan to be submitted at<br />
this time for secondary consent.<br />
Decommissioning<br />
Issues to consider<br />
Noise<br />
Decommissioning Decision<br />
Decommissioning<br />
Redevelopment<br />
As per Preliminary noise impact assessment<br />
As per Construction noise monitoring<br />
As per Planning Application, Construction and Operations<br />
Landscape<br />
Decommissioning<br />
Redevelopment<br />
Site rehabilitation will need to consider the landscape character<br />
that existed pre-development and should ensure this character is<br />
rehabilitated to it's original (or previous) form<br />
As per Planning Application, Construction and Operations<br />
Birds & Bats<br />
Assessment of possible impacts on key bird & bat species of<br />
decommissioning and of re-powering (upgrade of turbines)<br />
EMI<br />
Decommissioning Decision<br />
Redevelopment<br />
Addressing community complaints post-decommissioning<br />
As per Planning Application, Construction and Operations<br />
Community Consultation<br />
Prepare Decommissioning Consultation and Communication Plan<br />
Consider opportunities for community involvement in rehabilitation<br />
Project Sub-stages<br />
Activities to be Undertaken<br />
Decommissioning<br />
D1<br />
Decommissioning<br />
Decision<br />
Purpose:<br />
To assess the feasibility of decommissioning or redeveloping the site.<br />
Activity:<br />
Assessing the historic wind resource at the site, changes in turbines<br />
commercially available and a desktop feasibility assessment<br />
addressing items identified PF1 and PF3.<br />
Consultation:<br />
Stakeholder input should be sought.<br />
<strong>Draft</strong> <strong>National</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Development</strong> <strong>Guidelines</strong> – 2 <strong>July</strong> <strong>2010</strong> Page 197