Decommissioning (D2)<br />

Once a decision has been made to decommission the site, then a detailed plan should be<br />

prepared considering the issues of decommissioning in light of the assessment issues and<br />

any relevant conditions of approval.<br />

Given the time period between when the approval was given and the need to<br />

decommission, particular consideration should be given to any regulatory changes that<br />

have occurred in the meantime and the need to address any additional issues.<br />

The likelihood of decommissioning should have been identified in the permit application<br />

along with an expected life of facility and a new permit should not be needed to<br />

undertake this work. In the absence of such a consent, a new application may be required<br />

in order to decommission the facility.<br />

A permit condition should be applied requiring a decommissioning plan to be submitted at<br />

this time for secondary consent.<br />

Decommissioning<br />

Issues to consider<br />

Noise<br />

Decommissioning Decision<br />

Decommissioning<br />

Redevelopment<br />

As per Preliminary noise impact assessment<br />

As per Construction noise monitoring<br />

As per Planning Application, Construction and Operations<br />

Landscape<br />

Decommissioning<br />

Redevelopment<br />

Site rehabilitation will need to consider the landscape character<br />

that existed pre-development and should ensure this character is<br />

rehabilitated to it's original (or previous) form<br />

As per Planning Application, Construction and Operations<br />

Birds & Bats<br />

Assessment of possible impacts on key bird & bat species of<br />

decommissioning and of re-powering (upgrade of turbines)<br />

EMI<br />

Decommissioning Decision<br />

Redevelopment<br />

Addressing community complaints post-decommissioning<br />

As per Planning Application, Construction and Operations<br />

Community Consultation<br />

Prepare Decommissioning Consultation and Communication Plan<br />

Consider opportunities for community involvement in rehabilitation<br />

Project Sub-stages<br />

Activities to be Undertaken<br />

Decommissioning<br />

D1<br />

Decommissioning<br />

Decision<br />

Purpose:<br />

To assess the feasibility of decommissioning or redeveloping the site.<br />

Activity:<br />

Assessing the historic wind resource at the site, changes in turbines<br />

commercially available and a desktop feasibility assessment<br />

addressing items identified PF1 and PF3.<br />

Consultation:<br />

Stakeholder input should be sought.<br />