25.01.2015 Views

SOP Manual - Cleveland Fire Department

SOP Manual - Cleveland Fire Department

SOP Manual - Cleveland Fire Department

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Cleveland</strong> <strong>Fire</strong> <strong>Department</strong><br />

Operations <strong>Manual</strong><br />

Level IV<br />

Fixed Site<br />

A hazardous material (s) incident has occurred and requires community evacuation or in-place sheltering.<br />

Resources to handle the size of the incident or material (s) will exceed all local resources.<br />

Transportation<br />

A transport vehicle has been involved in an incident: (Any combination of the following)<br />

1. A fire or explosion has occurred involving the vehicle.<br />

2. A leak/spill has occurred that is more that the EPA RQ.<br />

3. Community evacuation has occurred or is necessary.<br />

4. Resources to handle the size of the incident or material (s) will exceed all local resources.<br />

Decision-Making Process<br />

The following decision-making model is taken from the National <strong>Fire</strong> Academy’s Initial Response to<br />

Hazardous Materials Incidents course. The process here is logical and easy to follow and is the one that the<br />

majority of members have been trained with.<br />

1. Gather Information<br />

This is the first step in any Hazmat incident. The information gathered here will be the basis for the entire<br />

incident. Due to the importance of this information, each piece will have to be assessed for importance and<br />

relevance and then prioritized for later use.<br />

2. Estimate Course and Harm<br />

Based on the information gathered decisions must be made on the current and probable course of the<br />

incident and the possible harm to all exposures involved. The worst case scenario should also be considered<br />

and prepared for but not to the extent that we use assets and resources that can be used to avoid this<br />

scenario.<br />

3. Develop Strategic Goals<br />

The strategic goals are broad, overall outcomes of how we want the incident to develop. As in all planning<br />

processes we want to develop more that one strategic goal and plan.<br />

4. Assess the Strategic Goals<br />

Are the goals presented possible given the elements of safety, personnel, equipment, weather, etc. Decide<br />

on which one (s) will be the most effective and safe and then proceed.<br />

Effective: June 1, 1997 Revised: 5/14/2009 Page | 133<br />

Approved by: Chief Chuck Atchley

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!