13.02.2015 Views

OPERATIONS MANUAL

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Limitations<br />

Approved low visibility approach & landing operations<br />

CAT I – decision height 200 ft or above:<br />

• Manual approach, with or without flight director.<br />

• Single, dual, or triple channel approach with manual landing.<br />

• Dual or triple channel approach and landing.<br />

CAT II – decision height 100 to 200 ft, RVR 350 m (1150 ft):<br />

• Dual or triple channel approach with manual landing.<br />

• Dual or triple channel approach and landing.<br />

CAT IIIa – decision height 50 to 100 ft, RVR 200 m (650 ft):<br />

• Dual or triple channel approach and landing.<br />

CAT IIIa all engines – decision height 17 to 100 ft, RVR 200 m (650 ft):<br />

• Triple channel approach and landing.<br />

CAT IIIa one engine out – decision height 23 to 100 ft, RVR 200 m (650 ft):<br />

• Triple channel approach and landing.<br />

CAT IIIb all engines – decision height 17 to 50 ft, RVR 125 m (400 ft):<br />

• Triple channel approach and landing.<br />

CAT IIIb one engine out – decision height 23 to 50 ft, RVR 125 m (400 ft):<br />

• Triple channel approach and landing.<br />

Triple channel: Three autopilots engaged (LAND 3)<br />

Dual channel: Two autopilots engaged (LAND 2)<br />

Single channel: One autopilot engaged (NO AUTOLAND)<br />

Autoland limitations<br />

Maximum glideslope angle: 3.25°<br />

Minimum glideslope angle: 2.50°<br />

Required flap setting: 25 or 30<br />

Runway slope limits<br />

Maximum +/- 2%<br />

Load acceleration limits<br />

Flaps up:<br />

Flaps extended:<br />

+2.5 g to -1.0 g<br />

+2.0 g to 0.0 g<br />

— Page 553 —<br />

For preview only. Not for sale. Many pages are intentionally removed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!